Please bypass the vehicle!From the 17th, the drainage pipe network reconstruction of the section of Taihua Street (Xinhua Road to Beihe Street)
The renovation project of the drainage pipeline network of Taihua Street (Xinhua Road to Beihe Street) is scheduled to start on June 17, 2022 (Friday) at 23:00.1. Construction timeFrom June 17th to Se
The city is about to be constructed here, pay attention to bypassing
Taihua Street (Xinhua Road to Beihe Street)Traffic Organization during the construction period of drainage pipe network reconstruction projectThe renovation project of the drainage pipeline network of
Please bypass the vehicle in the past!From the 17th, the drainage pipe network reconstruction of the section of Taihua Street (Xinhua Road to Beihe Street)
The renovation project of the drainage pipeline network of Taihua Street (Xinhua Road to Beihe Street) is scheduled to start on June 17, 2022 (Friday) at 23:00.1. Construction timeFrom June 17th to Se