Chen Zeyong checked the preparation of flood preparation for floods and floods
Author:Shangzhou Rong Media Time:2022.07.18
On July 16, the head of the district Chen Zeyong led the heads of emergency management, water conservancy, transportation, transportation and other departments to the Nanqin Reservoir and Banqiao Town to inspect and supervise the flood and flood preparation. He emphasized that it is necessary to resolutely implement the mechanism of "people's attention to prevent the withdrawal", do a good job of preparations for flood prevention and flood preparation, and keep the masses' life safety bottom line.
Chen Zeyong and his party checked the reservoir dam, flooding channel and material preparation, emergency plan, duty preparations on the site of the Nanqin Reservoir, and learned more about the management of the reservoir operation, the implementation of the responsibility system, and the flood prevention and flood preparation. He emphasized that the District Water Conservancy Bureau and Reservoir Management Station should attach great importance to the flood prevention work of the reservoir, resolutely overcome empiricalism and paralysis, and carry out hidden dangers to investigate regularly, improve the emergency plan as soon as possible, and truly implement the responsibility. It is necessary to strictly keep on duty, pay close attention to the weather situation and the changes in the upstream rain and water conditions, strengthen the monitoring of water conditions, report and early warning in a timely manner to ensure the smooth flow of flood prevention information channels. To strengthen the flood prevention publicity and education of the downstream people downstream of the reservoir, we will quickly carry out flood prevention drills with relevant towns (streets), communities, and village groups. Through the practical drill organizations, cadres and masses along the downstream are "who will withdraw, evacuate who, when will be withdrawn, withdrawal of withdrawals Where to go ", layer the responsibility of town cadres and district chiefs layer by layer, so as to count and prepare sufficient preparation.
In Qixing Village and Lihe Village of Banqiao Town, Chen Zeyong looked at the recent thunderstorms that caused recent rainstorms to lead to landslide and road damage, and the preparation of the evacuation of the resettlement point. He emphasized that flood prevention work is related to the safety of the masses. With the sense of responsibility of "rest assured" to ensure the safety of the people's lives first. After receiving meteorological forecast and unified emergency command scheduling scheduling, the town and villages immediately organize the leadership and cadres to go deep into the front line for the first time. Early warning to the household, and the timely threatened people were evacuated to a safe place, so that they would "withdraw in advance and withdraw during the day." It is necessary to recognize that it is easy to form sudden rainstorm climate in the Qinling Mountains. Town cadres must timely study and judge in a timely manner due to time, and quickly organize the masses to evacuate themselves to save themselves. , Do a good job of support for materials and life services, and resolutely prevent personnel from returning. For the section where the traffic interruption and safety hazards occur after the disaster, the transportation department and the town (street) must immediately repair the trail and set a warning mark on the dangerous road section to resolutely prevent secondary disasters.
Author: Chen Junjun Wang Lu
Edit: Liu Jiangshan
- END -
Lhasa Municipal Supervisory Bureau called for anti -normal patent application behavior
This website (Reporter Yang Zongzhuma) In order to implement the National Intellec...
The 40 -day long version of Sanfu Sky has arrived, and the strong convection weather such as heavy precipitation and thunderstorms in the short -term storm is also on the road ...
,It marks the hottest period of the year,As the saying goes, hot in three volts.Th...