Jinghang Canal Zaozhuang section navigation
Author:Zaozhuang Daily Time:2022.07.18
A few days ago, the ships with full -loaded goods sailed in an orderly manner to introduce the Yizhuang Reunion Boat.On July 13, the Jaozhuang section of the Beijing -Hangzhou Canal terminated the flood prevention level response and navigated during the period.Shandong Water Transport Development Group Co., Ltd. Zaozhuang Branch rationally formulated a adjustment plan, strengthened various service measures for ships and gates, and ensured the efficiency of the ship's gate gate and navigation.
(Photo by Sun Kai, a special reporter Zhang Yanxin reporter Wang Longfei, a special reporter from Zaozhuang Daily)
- END -
Yongdeng County, Lanzhou City will carry out large -scale nucleic acid testing
According to the needs of the epidemic prevention and control work, the leadership...
List of Harbin investigation and control policy (as of 9 o'clock on June 20, 2022)
List of Harbin investigation and control policy(At 9 o'clock on June 20, 2022)Sou...