Natural gas production in the first half of the Northwest Oilfield increased by 58.8% year -on -year

Author:Tianshan.com Time:2022.07.18

Tianshan News (Reporter Yu Jiangyan Correspondent Zhang Jun reported) In the first half of the year, the northwest oilfield produced natural gas 1.672 billion cubic meters, an increase of 58.8%year -on -year. Thousands of cubic meters.

The picture shows the Joint Station of Shubei Oil and Gas Field. Correspondent Zhang Jun

At the beginning of the second quarter, the production situation on the Northwest Oilfield was severe. All members of the Chinese Petrochemical Northwest Oilfield Branch launched a decisive battle in the second quarter to achieve double -half production work, strengthening fine development of oil production, and increasing harvesting by technical optimization, setting up award exceeding penalties for the establishment of prizes. The hard assessment of the arrears system has achieved a great situation of "tower river hard stability", "smooth production of the north" and "great development of natural gas".

The picture shows Shunbei 47X well. Correspondent Zhang Jun

The Tahe Oilfield is the main production block of the Northwest Oilfield. In the first half of the year, the Tower River Oilfield further accelerated the efficient reserves by deepening the sewing and exploration efficiency technology.

Accelerate the optimization of the integrated application of modeling digital modulus. This year, the Tower River Oilfield has expanded the scale of gas injection and water injection. Nitrogen injection and water injection have increased yield of 850,000 tons, and the harvest rate has increased by 0.4 percentage points. At present, Nissan's oil level has been increased from 15,187 tons at the beginning of the year to the current 15,690 tons.

The inspection worker inspected the tower oil field. Correspondent Zhang Jun

Shunbei Oil and Gas Field is an important increase in storage and production in the "Thirteenth Five -Year Plan" period of Sinopec. Since the announcement of major commercial discovery in August 2016, the integrated development of Northwest Oilfield exploration and development has steadily advanced. In the first half of the year, Shunbei oil and gas fields have put into production capacity projects in total, providing hardware support for high -quality and efficient development.

At present, Shunbei No. 4 Belt has been put into trial mining for 11 months. As of June 30, a total of 915 million cubic meters of natural gas and 457,000 tons of condensate oil have been produced, which is equivalent to nearly 1.2 million tons of oil and gas equivalent. New record for production.

The Yakra block in the Northwest Oilfield is Sinopec's largest rectification condensate gas field. Facing the difficulty of accelerating the decrease in the after -development period of the Yakra gas field, technicians have basically achieved the hard stability of oil and gas production by deepening the understanding of oil and gas collection, the main layer of overall flow field adjustment, and optimizing the supporting ground process support. Up to now, Nissan 1.5 million cubic meters and Nissan crude oil 760 tons.

- END -

"More than 3,000 days and nights, we are all thinking about him, today we finally dream!"

At 21:00 on June 13, the telephone ringing of the Dajing Police Station of the Pub...

Liu Gelin: Pen and ink as a stick, climbing to the Great Wall ︱ Oral Art Garden

Introduction of Liu Gelin: Deputy Chairman of the Oral Culture Professional Commit...