Zaozhuang City Central District strengthens flood prevention measures to ensure safety flood
Author:Qilu.com Time:2022.07.15
Qilu.com · Lightning News July 15th. On July 15th, the news office of the Central District Government of Zaozhuang City held a press conference to improve the quality of the city and create a beautiful and neat crowd environment. At the meeting, Shao Zexing, a member of the Party Group and Deputy Director of the Municipal Garden Service Center of the Municipal Central District, introduced the frequent weather such as thunderstorms and heavy rainfall since entering the flood season.
The first is to implement the responsibility system for flood prevention and typhoon prevention. A flood -resistant rescue assault team of flood control and typhoon prevention groups and 113 people were established, and the 24 -hour duty and leadership led -class system was formulated. The emergency plan for flood prevention and typhoon prevention was formulated, and the emergency response work of flood prevention and typhoon prevention of flood -proof typhoon, main secondary trunk roads, street lights, parks, parks, plazas, nurseries, and laid -off trees was implemented.
The second is to clarify the division of responsibilities and do a good job of flood prevention during the flood season. The city's urban flood prevention and drought resistance office formulated the 2022 flood prevention and typhoon work plan. It is led by the District Comprehensive Administrative Law Enforcement Bureau to unite the district municipal garden service center and territorial town street to refine the down -to -bridge, the main roads, and important stagnant water. The division of tasks of the point, responsible for people, do their best to do the flood control work of the under -dharma bridge and road drainage wells.
The third is to complete the renovation of the water accumulation of the Nanyuan Interchange Bridge. Newly built a pump station on the east side of the overpass, a 315kva transformer was built, 3 fixed drainage pumps were installed, the daily drainage capacity was 3100m3/h, and 2 mobile pumps were installed. Pumps are drained, plus the original 500m3/h drainage pump on the west pump station on the west side of the bridge, and the maximum drainage capacity is 5600m3/h. It is also equipped with a 5000m3/h and 2000m3/h drainage pump truck, and it is emergency spare at any time during the flood season. In addition, a cross -stream of construction on the north side of the Nanyuan Lijiao Bridge is built. Open the manhole cover during rainfall, and let the warning steel cage be reduced to reduce the remittance of rainwater into the bridge.
The fourth is to strengthen the investigation and rectification of hidden dangers. Combined with the recent rainfall, renovation measures were proposed to the urban interchange bridge. At present, the Guangming Road Interchange Bridge has completed the installation of 55KW drainage pumps, and the installation of the 37kW drainage pump has been completed in the construction of the North Road Railway Bridge. Install. Ensure that the interchange bridge of the urban area can meet the drainage requirements.
Lightning News reporter Liu Congcong Correspondent Zhang Shibing reported
- END -
From August 1st, the implementation of local standards "Technical Procedures for Forest Mortarity" released in Sichuan Province will be implemented
Cover Journalist Gou ChunOn June 24, the cover reporter was informed that recently, the Sichuan Provincial Market Supervision and Administration Bureau approved the release of local standards, DB51/2
[Follow] Play "empty city plan" on duty?Punishment!
Recently, Enshi, HubeiOne resident found his own communityNo one is on duty in the...