Baoji High -tech Zone: municipal, greening, sanitation workers fought on the front line of flood prevention and drainage
Author:Baoji News Network Time:2022.07.15
(Baoji News Network Luo Jun intern Zhang Xuelian) In the past few days, Baoji City has encountered continuous heavy precipitation, causing many sections of Baoji High -tech Zone to severely accumulate water. Baoji High -tech Garden Sanitation Municipal Construction Management Co., Ltd. heard the rain and started emergency plans in time. More than a thousand people in the sanitation, greening, and municipalities were operating in the rain. Work.
On July 12, the reporter saw on the High -tech Avenue that the water accumulation depth of some sections had reached more than 30 centimeters. A mobile pump truck was continuously pumping. Two green workers on the side opened the manhole cover in the top of the wind and force. Accelerate the drainage speed. On the side of the road, sanitation workers used tools such as iron shovel, steel picks, etc. to clean up the blocks stuck in the drainage outlet in time to ensure that the water pipeline was smooth.
Liu Jia, deputy general manager of Baoji High -tech Garden Municipal Construction Management Co., Ltd., introduced that in response to the problems of some road rainwater orals, during the cleaning process, 5 to 10 people in a group of sanitation workers should be used to concentrate on manpower. Then, in order to be responsible for small -scale accumulated water, the drainage effect of the stagnant water section is obvious. At the same time, the sanitation staff also made full use of the timing of precipitation to clean the pavement and rain wells, and timely collect the cleaning, paper dandruff, and debris to ensure that there is no large area of the pavement after the rain. The phenomenon of water and sludge provides a clean and tidy city -capacity environment for citizens.
The reporter learned that in the process of this round of precipitation, Baoji High -tech Garden Municipal Construction Management Co., Ltd. was deployed and arranged for the division of labor, tools, and facilities in the region in accordance with the pre -formulated flood prevention and drainage emergency plans in advance. Arrive at the designated point, open the drainage well, place a warning sign, and take care of the well -opened well. At the same time, collaborate with Baoji High -tech Zone Basic Supporting Companies, dispatched 3 mobile pumping stations, 1 mobile pump truck, more than 10 rescue transportation vehicles, 8 aircraft sweeping vehicles, 11 cars washing, 12 clearance vehicles to cooperate with the operation to speed up Drainage speed. In response to a new round of heavy rainfall in the future, the Baoji High -tech Zone arranged for a special person in the waterlogging point for 24 hours. It will quickly enter the drainage state according to the rain, and strive to eliminate the waterlogging situation in the shortest time.
- END -
[Jian Jian No. 3] Building an epidemic prevention and control line, Huangpu Public Security strengthened personnel to gather places for management
As the city fully entered the re -production and resumption of the city and resume...
Stop immediately!Emergency off the shelves
July 1stPublished by the State Drug Administration websiteAbout the name of stoppi...