One bridge and three uses!The high -speed rail, intercity railway, and highways have gathered together!

Author:China Railway Time:2022.07.15

With the opening of the Zheng Duan of Jixian Gao Rail, the operation

Zhengzhou Wantan Yellow River Gong Railway Bridge

Entering everyone's vision

It is said that this bridge

Full of technology, a lot of views

What is more powerful is

This bridge will be realized in the future

High -speed rail, intercity railway, and highway three bridge unity

Xiaobian, this starts the field visit mode

Reveal for everyone

Speaking of this bridge

These knowledge points must be understood!

01

The combination of steel truss beam and non -道 orbit

The structural design of the Zhengzhou Wantan Yellow River Public Railway Bridge is novel. For the first time, the construction process combined with steel truss beams and non -砟 orbits and the design of no -orbital rails can remain smooth and smooth when running at high speed.

02

4377 meters long!

The bridge is 4377 meters long, with a width of 32.5 meters and a railway of 26.8 meters. The width is equivalent to twice that of the Zhengxin Yellow River Bridge of the Beijing -Guangzhou high -speed rail. It has a milestone in the history of China's railway construction.

03

"Technology Empowerment" Guardian Bridge Security

The bridge uses advanced technology methods such as health monitoring system, video inspection vehicle, damping device, and horizontal monitoring device. 17 kinds of 339 monitoring equipment are installed on the whole body of the bridge, which can realize real -time monitoring, statistical analysis and status early warning of video, displacement, water level, rainfall, temperature and humidity, etc., and "scientific and technological empowerment" in real time guarding the bridge safety.

sensor

Camera

Video inspection car

04

Flood resistance "five stars"

The Zhengzhou Wantan Yellow River Public Railway Bridge uses the lock -mouth steel pipe pipe pile coffin, with a diameter of 2 meters and a deepest of 98 meters. Audicatedly speaking, even if the four small waves reservoirs at the same time can only achieve the artificial guarding police abstinence, the flood resistance ability is "five stars".

recently

Zhengzhou Wantan Yellow River Gong Railway Bridge

Welcome to the first flood season after opening

Professional uses scientific and technological means

For the key data of the bridge, the surrounding environment, etc.

Carry out 24 -hour real -time monitoring

Adopting the "Scientific and Technological Measures+Artificial Work" mode

The security of the bridge is continuously guaranteed

For this bridge

What else do you want to know?

Supply: "People's Railway" Newspaper Co., Ltd. Henan Reporter Station (Zhengzhou Bureau Group Company Rong Media Center), "People's Railway" Newspaper Co., Ltd. Film and Television Center

Wen Tu: Xiao Peiqing Jiao Tingting Tang Zhe He Zhenkui Li Jiawen

Video: Deng Chouhao Jiao Tingting Tang Zhe Dong Jianbing Cui Chenwei

Edit: Han Han

- END -

Picking up a mussels on the banks of the Huaihe River

Chaoyang reflects the golden dazzling light in the depths of the river, and reflec...

"Three One" without fading the "three one" play a role model for garbage classification

Consumer Daily News (Reporter Wang Hongsheng) Quan Huifang is a retired veteran ca...