Unblocked the Grand Channel of the Central District of Qingdao!Huazhong Road through the "general attack order"
Author:Costrit Finance Time:2022.07.14
Wind Financial Reporter Wang Hao
This year is the beginning of the three -year tackling operation of Qingdao City and the construction of urban construction. As one of the eight major campaign, the construction of municipal facilities construction is clear, and the construction of key projects and the lack of existing roads will be opened.
On the 14th, the construction of the Huazhong Road Pinsen Project Mobilization Conference was held in the conference room No. 7 of the Chengyang District Administrative Center. It is reported that the implementation scope of the project starts from Zhengyang West Road in the south, and has been completed in the south. At the meeting, the construction units in 10 industrial areas signed a military order with Shanghai Construction Industry Group, Shanghai Construction Industry Group and Dynamic Investment Group, and eight communities signed commitments. Everyone unanimously stated that in accordance with the requirements of unified deployment, strengthen political awareness, establish overall concepts, and promote the implementation of project implementation with higher quality work to ensure that the southern section of the project through the project (Zhengyang Road to Chunyang Road) has the main line before the end of November. Train conditions.
This is a future -like Kangzhuang Avenue. Huazhong Road Expressway connects high -tech districts from the south, the rail transit demonstration zone, and the administrative district of Jimo District. The road network and traffic functions are very critical. Just as the Standing Committee Member of the Chengyang District Committee, the deputy secretary of the Party Working Committee of the Qingdao Rail Transit Industry Demonstration Zone and the deputy director of the management committee presided over the daily work, the mobilization conference said that after the completion of Huazhong Road in Chengyang District, For streets and communities, it is a great thing to increase land value, bring business opportunities, and bring flow of people.
Highlights: Create landmark project Huazhong Road and synchronize with river governance
Huazhong Road has a total length of about 6.96 kilometers, with a total investment of about 1.32 billion yuan. This project is the main channel of the north and south of the central area of the North Bank. It is the main urban area of Qingdao's main urban area and the western area of Chengyang to Jiaodong International Airport. Improve the regional rapid transportation system and effectively drive the development of land along the road, which is of great significance to regional economic development.
At the meeting, Ji Jiadong, the twelfth tour of the Municipal Party Committee's "Make -up ability improvement year", attended the meeting. Standing Committee Member of the District Party Committee, Deputy Secretary of the Party Working Committee of Qingdao Rail Transit Industry Demonstration District, and deputy director of the management committee, the deputy director of the management committee, the deputy director of the daily work, the Standing Committee of the District Committee, the Secretary of the District Discipline Inspection Commission, the Director of the District Supervision Committee, and the Disciplinary Committee of the Disciplinary Committee of the Disciplinary Committee of the Qingdao Rail Transit Industry Demonstration District Cheng Daonian, the secretary of the Secretary and the Municipal Supervision Commission sent Qingdao Rail Transit Industry Demonstration Zone, and Qiu Shaobo, a member of the District Government Party Group, Secretary of the Party Committee of the Chengyang Public Security Branch, and director, attended the meeting and delivered a speech. Lu Zhaogang, deputy commander of Chengyang District, district urban renewal and deputy commander of the urban construction headquarters, and director of the office, chaired the meeting. Fan Baocai, a member of the Party Working Committee of the Demonstration Zone and Deputy Director of the Management Committee, read out the list of leadership groups of Huazhong Road through the construction of the Huazhong Road.
Bi Jianguo pointed out that the Huazhong Road through the project is a specific action to implement the instructions of the main leadership instructions of the Qingdao Municipal Party Committee and the decision -making and deployment of the Chengyang District Party Committee and District Government. The project construction adopts the main and auxiliary separation and two -way eight -lane forms across the board, which will become the north -south main road that runs through the main urban area, Chengyang District, and Jimo District. 2. Improve the quality of livable life along the line to play an important role.
At the meeting, Wang Chong, deputy secretary of the Party Working Committee and Director of the Office of the Stroke Sub -district, and the Secretary of the Party Branch and Director of the State Committee of the North Division Community of Shangma Street, Meng Factory made a statement on behalf of the streets and communities, respectively. Li Xingxin, chairman of the Investment Group, made a statement on behalf of the construction unit.
At the scene, Shanghai Construction Engineering Group and Dynamic Investment Group signed a responsibility state with Shanghai Construction Industry Group. Seven communities, including Rhongan Village Community, Gangbei Community, Xiaya Community, Shangya Community, Gu Island Community, Dongcheng Community, and Beicheng Community.
The relevant departments of the district, the main responsible persons of the relevant departments of the district, the streets, the streets of Shangma, and the relevant communities, all members of the leading group of Huazhong Road through the construction of the project construction project, and the leaders of the participating enterprises attended the meeting.
It is worth mentioning that the construction of Huazhong Road through the construction of the main and auxiliary separation and two -way eight lanes throughout the line. At the same time, it has high requirements for green land landscapes and synchronize with the governance of the Xiangmao River. This also means that after the future, it may become another landmark project with both "traffic" and "landscape value".
Determine: Ensure that the project progress is signed on the spot "commitment" and "military order"
From the south of Huazhong Road Expressway, the Hongdao Toll Station on Jiaozhou Bay Bridge is connected to Qingyin Expressway in the north, with a total length of about 21.6km.
The reason why it is important is evident in terms of location function. The road is located in the central axis of the city of Huanwan. It connects to the Jiaozhou Bay Bridge in the south to form a key skeleton connecting the road network of the Three Bank urban areas. It connects 3 high -speed speeds (Jiaozhou Bay Bridge, Jiaozhou Bay Expressway, Qingyin Expressway), 2 Expressway (Zhengyang Road, Northern Express Road), as well as 10 main roads such as Shuangji Road, Chunyang Road, G204. In addition, with the opening of Qingdao Jiaodong International Airport, Huazhong Road has also become an important path to connect the main urban area and the airport.
For a period of time, the road construction progress on Huazhong Road has attracted much attention. Earlier, the high -tech zone Huazhong Road Project Houyang Section road due to the impact of the project's cross -high -speed rail line, highway and demolition land, which was unable to connect, restricted the performance of Huazhong Road, and also restricted the Qingdao urban area. With the fast channel of the airport direction. In 2021, after the efforts of all parties, the 773 -meter -free neck section finally announced the opening of traffic. At this point, the traffic of the high -tech zone and the main urban area of Qingdao will be more convenient. It is expected to save about 15 minutes by driving time. As a people's livelihood project, after the operation of Huazhong Road, it can effectively pull the distance from the western area of the city and other urban areas of the high -tech zone and the rail transit industry demonstration zone to open up the large loop of the east to the Blue Valley, west to Jiaodong Airport. It is of great significance to promote economic and social development in the western region.
So, how does this time the Huazhong Road of Chengyang District ensure the progress of the project? "On behalf of the community party branch and neighborhood committee, I have a solemn promise to the District Party Committee and the Street Party Working Committee that if members of the leadership team and party members in this community have obstacles to the construction of the leadership team and the secrets of the party members, they voluntarily accept the investigation and treatment of disciplinary inspection, public security and other departments. If the community's personal obstruction of the construction occurs, the community is responsible for the first time to effectively solve it to ensure the normal advancement of the project. "At the scene, the Secretary of the Party Branch and Director of the Disposal Committee of the Beibei Street of Shangma Street made such a commitment on behalf of the community. He said that this project involves 21 plots of the north community. The community will resolutely remove the hard bones around the mission of demolition, complete the work of demolition and clear tables on time, and lay the foundation for road construction.
As a representative of the project carrying the streets, Wang Chong, director of the Stroke Sub -district Office, said that Rhonghong Beach will resolutely complete protection tasks such as demolition and land acquisition with the most powerful measures and solid style to ensure the smooth progress of the project. "On the basis of completing the signing of 11 demolition entities in the early stage, compact the responsibility of the community, speed up the transfer of seedlings, and strive to complete the clearance work by July 15th."
At the same time, the military order signed by the construction unit of 10 engineering areas with Shanghai Construction Industry Group, Shanghai Construction Industry Group and Dynamic Investment Group is by no means "walking through the field", but in the way of white paper and black words to make the progress of the project's progress in the actual promotion procedures. thin. It is understood that according to the agreement, if the construction party cannot be completed as scheduled, the corresponding proportion of the project will be deducted directly, and every day of delay will be accumulated.
Guarantee: "Police and Insurance Co -control" strictly beating the hazardous project construction illegal crime
According to the plan, the governance of Huazhong Road and the Xiangmao River in Chengyang District is carried out simultaneously. There is only one goal, which is to build this road into a boutique project and landscape avenue.
How to ensure the completion of the high standards of engineering, effectively prevent various risks? Bi Jianguo emphasized that the district units should clarify the work goals, make every effort to coordinate and promote it in accordance with the requirements of their duties, serve the whole process, and be the "shop primary two" of good service companies; , Rely on service, quickly and properly solve the various problems of the community, and create a good atmosphere for the project smoothly; all participating enterprises must press the responsibilities of various work, strictly control the production safety, and ensure that the project construction is high standards and high quality. Realize the expected goals.
Cheng Daonian pointed out that the Huazhong Road through the project is both a traffic project, a livelihood project, a high -quality project, but also a clean and urgent political task. All units and departments should start from their own positions, strengthen service awareness, optimize the process of work, and improve service efficiency; all street communities must find their own positioning and clarify work measures, and we must sincerely officers, conspiracy, and dedication.
Cheng Daonian emphasized that Huazhong Road has been in the project that has a significant and high investment in the project, and it is inevitable that there are hidden dangers of corruption. In all aspects, we must do a good job of preventing and controlling integrity risks, and always be aware of, watched, clear rules, regulate fear, and keep the bottom line. The Chengyang District Commission for Discipline Inspection and the Municipal Discipline Inspection Commission will send the Discipline Inspection and Supervision Committee to unblocked the reporting channels, accept social reports, and resolutely investigate and deal with the issues of disciplinary violations.
Li Xingxin, chairman of Qingdao EMU Town Investment Group Co., Ltd., said that it will strictly control the five major levels of the project's "safety, quality, progress, design, and cost", pressing the responsibility of various work, promoting the rapid start of project construction, steady advancement, early early advancement, early advancement, early advancement Construction, go all out to build the Huazhong Road through the construction of the Huazhong Road into high -quality projects, high -quality projects, and rest assured projects.
At the same time, in order to ensure the smooth progress of the project, various guarantees are also improving. According to reports, the Chengyang Public Security Branch will carry out the special operations of "Thunder Campaign · Eli Jianjian" and social security University investigation, actively promote the "police security joint control" work experience, and strive to strengthen the cleanup of public security patrols around the project In conjunction with relevant units to strengthen the investigation and rectification of hidden risks, and effectively maintain the stable and orderly production order. Strictly crack down on all kinds of illegal and criminal activities that are hazardous project construction, and illegal criminal acts such as strong buying and strong selling, obstructing construction, strengthening projects, and provocative troubles, especially illegal acts that protect the construction of the village's collective interests and seek private interests. Persist in showing up, never tolerate.
- END -
Xuchang Meteorological Observatory lifted the thunderbolt and windy yellow warning [III class/heavie
Xuchang Meteorological Observatory lifted a thunderstorm and yellow warning signal at 3:10 on June 10, 2022.
In the first half of the year, my country's undertaking service outsourcing contract increased by 12.3% year -on -year
Xinhua News Agency, Beijing, July 20 (Reporter Pan Jie and Xie Xiyao) The Ministry of Commerce released data on the 20th that in the first half of this year, the amount of the service outsourcing cont