Xingfeng Online | Feel the muddy road in the rain on the spot -it is difficult to rectify immediately!
Author:Laosi Time:2022.07.14
"Wind Online"
2022.7.12
On the morning of July 12, Li Xian, chairman of the people's congress of Chagzhuang Town, launched the "Wind Online" program, and developed online exchanges with citizens and friends around the work of rural revitalization and urban construction around the rural rejuvenation and urban construction.
During the launch, a total of 17 citizen consultation reflected the problem.
The reporter followed Li Xian to go to the scene and implemented it with the business department, the Beiling Party Mass Service Center, and the village. When I arrived at the scene, it was just raining, and I felt the trouble of the road to the villagers on the spot.
The road accumulates cement, and it is difficult to walk, "one step at a time", which affects travel. The exposed stones have also broken the tires for the villagers traveling by bicycle.
This section of the road is soil production road. After the rainy season, the road is muddy. After the study decided to stop the rain, the village contact the construction team entered the road to the road before July 20, and at the same time paved the stones Essence
The reporter came to the scene to learn that the dam of the dam was flat and tidy, but the slope of this road connected to the field was large and it was an ordinary dirt road. When it comes to rainy days, it is muddy and difficult to do, causing inconvenience to farmers entering and leaving the fields, difficulty climbing agricultural machinery, and a certain hidden safety hazard.
After receiving the issues reported by Ms. Zhang, Li Xian immediately led the relevant personnel of the water station, the engineer of the water conservancy bureau, the construction unit, and the cadres of Shuangshan Village to the scene to find out and found that due to the increase in the design of the Dam during the construction of the Happiness River, the original existence caused the original communication. The slope of the dam of the dam has become steep, and the agricultural machinery vehicles are difficult to pass.
After research on the site and the Municipal Water Resources Bureau engineer and construction unit to determine the rectification plan: First, the soil road base of the river gate production road was mechanized, and then the road surface of the concrete concrete hardening was used. The slope is extended, and then the soil road base performs mechanical compaction, and the cement concrete is 3 meters long. The rectifications will be concluded before July 20 to ensure that the villagers can pass safely and conveniently.
Reporter: Shen Jin Qu Junxi
- END -
Beijing: Encourage car consumer activities to promote consumer activities, and give up to 500,000 yuan in funding support for eligible enterprises per quarter
[Dahecai Cube News] On July 18, 11 departments such as the Beijing Municipal Bureau of Commerce issued the Several Measures on Accelerating Second -hand Circulation to Promote the upgrading of automo
New outfits are played, guarding will not change
The law enforcement is the people, and the original intention is not forgotten. Af...