Promote green development of urban and rural construction!By the end of 2025, our province will add more than 17,000 charging piles

Author:Life newspaper Time:2022.07.13

In order to solve the problems of imbalanced and insufficient urban and rural construction of urban and rural construction in our province, combined with the actual situation of our province, our province issued the "Implementation Opinions on Promoting the Green Development of Urban and Rural Construction".

By 2025, the province's urban and rural construction will achieve green low -carbon transformation

By 2025, the province's urban and rural construction will achieve green low -carbon transformation, and the quality of green development in urban and rural construction will be significantly improved. The development indicators of urban and rural infrastructure and public service facilities will strive to achieve the national average level, architectural style characteristics, historical culture protection and disaster prevention and mitigation capabilities. Further enhanced, the green lifestyle is generally promoted, the urban and rural ecological environment has improved significantly, and the livability of urban and rural areas has improved significantly.

By 2035, the province's urban and rural construction will achieve green development in an all -round way, the level of carbon reduction reduction will be significantly improved, the quality of urban and rural living environment will be comprehensively improved, the governance system and governance capacity of urban and rural construction areas have basically achieved modernization, and the goal of beautiful Longjiang construction is basically realized.

By the end of 2025, the rectification rate of urban waterlogging points reached 100%

Relying on large channels such as backbone high -speed railways, Harbin, Daqing, Qiqihar, and Mudanjiang Innovation Cooperation are promoted to build an excellent transportation circle, an advantageous economic circle, and a beautiful business tourism circle, and promote the integration of intercity railway, municipal railway, rail transit and ground transportation. Promote the energy layout of distributed, networked, and intelligent sustainable development, and reasonably plan the charging and hydrogenation facilities for new energy vehicles.

By the end of 2025, the rectification rate of urban waterlogging points will reach 100%, and a relatively complete urban drainage and waterlogging project system will be established. More than 30%of the urban construction zone will meet the requirements of sponge cities. Continue to promote the investigation and management of hidden dangers of the gas industry, strengthen technical support and intelligent management and control, and achieve precision supervision, source governance, and scientific prevention. By the end of 2025, the city level can realize the gas information supervision platform Unicom.

By the end of 2025, more than 17,000 charging piles were added

Accelerate the census of urban underground infrastructure, implement the reconstruction of heating, drainage old pipe networks, and secondary water supply pumping station pipe network transformation. By the end of 2025, cities at or above the municipal level completed the underground pipeline census, the leakage rate of the urban water supply pipeline was controlled within 10%, the transformation of the old pipeline network was 4,000 kilometers, and the centralized collection rate of urban domestic sewage reached more than 70%. The harmless disposal rate reaches more than 95%.

Promote renewable energy applications such as deep geothermal energy, biomass, and solar energy according to local conditions. By the end of 2025, the city -level cities and county -level cities will have a smart heating demonstration project of 50%, and other counties will reach 30%. Promote the construction of urban rail transit systems and slow line systems, and build special bicycles and green roads according to local conditions. Accelerate the convenient and efficient charging infrastructure, relying on bus stations, parking lots, highway service areas and other places to build a pile and intelligent and efficient charging infrastructure system. By the end of 2025, more than 30 new power stations, more than 650 charging stations, and more than 17,000 charging piles were added.

By the end of 2025, 300 beautiful and livable villages were built

Promote the construction of beautiful livable villages. Improve the design and construction level of farm houses, build new types of agricultural houses that meet the actual needs of rural production and life, and strengthen existing farmhouses to earthquake resistance and energy conservation. Based on the resource advantages, build a unique agricultural industry chain, develop a variety of forms of moderate scale operations, support the connection market such as "company + farmers", and cultivate rural culture, tourism, leisure, homestays, health care, traditional handicrafts and other new techniques and other new craftsmanship and other new craftsmanship. Condition. Strengthen the planning and construction of border villages and ethnic villages. By the end of 2025, 300 beautiful livable villages were built.

"Should be changed" for non -energy -saving buildings before 2000

By the end of 2025, the promotion of urban green buildings accounted for 100%of the new building, and the proportion of star -rated green buildings would reach the national average. Combined with the transformation of the old districts of urban and towns to promote the existing energy -saving transformation, it should be "changed" for non -energy -saving buildings before 2000.

By the end of 2025, the policy system and industrial system of intelligent construction and construction industrialization development will be basically established, and prefabricated buildings account for 30%of new buildings; Tons, prefabricated buildings are not higher than 200 tons per 10,000 square meters.

By the end of 2025, the application rate of BIM technology on projects above designated size will reach 80%

Accelerate the construction of the smart city system. Establish and improve the standards and policies of smart cities, and carry out pilots of smart cities. Accelerate the construction of "Digital Longjiang", develop digital industries such as artificial intelligence, cloud computing, blockchain, the Internet of Things, and big data, develop and cultivate intelligent application scenarios, expand smart cities, smart transportation, smart tourism, smart heating, smart medical care Applications in other fields to create a "5G + smart industry" application system. Carry out the construction of the urban information model (CIM) platform, build a urban operation management service platform and smart property management platform, and promote the deepening application of building information model (BIM). By the end of 2025, the application rate of BIM in projects above designated size will reach 80%.

Copyright Statement: Reproduced in any form without permission

Dragon Head News · Life Daily Reporter: Liang Chen

- END -

Zhaotong Yanjin: "Ringzai Combat" exhibition style party building leads to promote revitalization

In order to motivate and guide the village work team to consolidate the results of...

The courier brother transforms into a "grass -growing person", they use this way to give back the community

Jimu News reporter Wang JunVideo editing Wang JunCorrespondent Li HuiIntern Jia Sh...