good news!Xuanwei Donghe Park Park is completed and opened

Author:Xuanwei Rong Media Time:2022.07.13

Donghe Shiguang Park belongs to one of the sections of the Donghe Landscape Project of the PPP project of Beipanjiang River Basin, and has always attracted much attention. A few days ago, the park was officially completed and opened, and provided citizens with a good place for leisure, entertainment, and fitness.

The construction of Donghe Shiguang Park starts from construction streets in the north, to Tong Station Road in the south, planning Riverside Road in the west, and planning red lines in the east, with a length of 537 meters and a total area of ​​about 119.32 mu. Trails, leisure squares, hydrophilic platforms, scenery, gallery frames, scene bridges, public toilets, landscape lighting, greening and supporting facilities. The park design combines the location characteristics of the eastern end of the city. Through plant design such as forest land restoration and Tailai flower belt, the Xuanwei ecological green city construction goals are displayed.

Donghe Shiguang Park design is positioned as a natural scenery riverside park. It integrates public tour, sports and leisure, and wisdom science. With the theme of "Seven Color Flowers", through rich plant design, combining the space on both sides of the river, It is divided into five areas: rhododendron, Qiufeng Wangyue, nursery story, jujube grass beach, and green wild fairy. It shows the beauty of Xuanwei plant landscape and the beauty of ecology, and shows the new look of Xuanwei New City.

It is particularly gratifying that the construction of the park has retained the original big trees that have been growing in the East River for many years, combined with the goal of ecological landscape construction, to create a comfortable and pleasant tree -lined area for citizens' recreation activities.

As one of the East River Landscape Projects of the PPP project of Beipanjiang Basin, the East River Landscape Project is basically completed at present, the west coast of the East River Park Park has been basically completed, and it is now accelerating the greening of the west coast, the East -West Bank connection bridge, and the construction of the landscape project on the east coast. Essence In the future, chairs, trash cans and lighting facilities will be added in the park according to the needs of citizens to improve the construction of the park and create a public tour, sports and leisure, and smart science.

Text/Tu Tianlin Zhao Xiong Fei Ning Lijuan

- END -

[Children's Popular Science Audio-Science Opening Door] What should I do if I am trapped in the 320th episode?

Children, what should I do if you are trapped in the elevator?Come and listen to t...

Prevention of minor drowning Lianyungang Haizhou establishment of a reward of the "whistle" system

Zhonghong.com, Jiangsu, July 14th. On July 9th, the Haizhou Public Security Branch of Lianyungang City, Jiangsu Province, the Haizhou District Education Bureau and the Haizhou District See Yiyong issu