There are "4S" stores in the first "Cross" station in China!
Author:China Railway Time:2022.07.12
Recently, the Yuxiang high -speed rail benefits long section
Changsha West Motor
(The following is referred to as "Changsha West Automotive House")
Core engineering -Six -line inspection Kuku capsule
The train of the EMU is put into use as scheduled
Lay the solid foundation
The application of Changsha Western Motor Vehicle is one of the first important construction projects in Changsha West Station in China with the "Cross -shaped" station.
The EMU is located in the southwestern part of Changsha West Station. The new 6 -line inspection library and 26 storage lines are built. It supports the construction of related production and living office facilities. The 4 -line inspection library and 14 storage lines are reserved.
The line is in line with the west end of Changsha West Station, covering an area of 895 acres, and the total area of new houses is 57,000 square meters.
The construction area of the six -line inspection library was 23,700 square meters and the building height was 15.05 meters. It was a steel mesh structure.
During the construction process, the construction unit coordinated the epidemic prevention and control and production organization, and successively overcome the difficulties of construction organizations such as large steel mesh span and multi -crossing operations in the library.
Why should Changsha West Station be equipped with this "4S shop"?
1. Since the vehicle group and traditional trains are large in terms of locomotive structure and body parts, it is necessary to configure the EMU to be responsible for the maintenance, commissioning, maintenance and maintenance of the EMU trains to ensure the daily safe operation of the EMU and High -efficiency transportation.
2. The EMU of the entire line of the long -term section of the Yuxia high -speed rail needs a fixed parking site to ensure that timely maintenance and safe parking can be maintained in time when not driving at night, and it is also convenient for uniform scheduling.
3. The northwestern end of the Yuxia High -speed Railway Yijun Section is connected to the Qianchang Railway and Xiangchang High -speed Railway. The construction of Changsha West Motor Vehicle is precisely the situation of the joint vehicles of the later and other high -speed rail lines, which can maximize the reasonable allocation of resources.
At present, the long -term section of the Yuxiang high -speed rail has entered the trial operation stage. The ceiling has created conditions for the installation of various precision maintenance equipment in the database and the timely connection between the inner orbit and the station line.
After the completion of the Changsha West Motor Vehicle, it will radiate the high -speed rail network and intercity network in Hunan Province, and greatly enhance the ability of Changsha as the ability to maintain and store the vehicle group for vehicle groups, providing a strong guarantee for future high -speed rail construction.
Material: "People's Railway" Newspaper Co., Ltd. Guangdong Reporter Station (Guangzhou Bureau Group Company Rong Media Center)
Photo: He Tingzhao Zhang Jianjin, Xu Bo Wang Yi Wang Qi
Edit: Jin Xuanmei
- END -
Qin'an County Meteorological Observatory issued a thunder and yellow warning signal
Qin'an County Meteorological Observatory issued a thunderbolt yellow warning signal at 18:34 on June 08, 2022: It is expected that this evening to night, our county Wangpu, Weidian, Guo Jia, Lotus, Fi...
Zhang Xiaoquan's kitchen knife is "not recommended to shoot garlic". York Electric's wind machine "is not recommended to use mountain spring water". How can the responsibility be pushed?
China Well -off Network, July 18th reporter Guo Yan Recently, Zhang Xiaoquan's ...