Connect the East Third Ring Road Expressway!Harbin Beimen Street Viaduct is about to start
Author:Life newspaper Time:2022.07.11
Recently, the Beimen Street Elevated Project Chengqiao Project is approved by the relevant departments and is currently conducting a public bidding for the Chengqiao test of the project. Beimen Street elevated projects are 3.4 kilometers in length, with upper and lower ramps on the south side of the cement road and the north side of Lifai Street.
According to the bidding documents, the Beimen Street elevated project, the planned starting point is connected to the Binbei Bridge. The ending point is 300 meters on the south side of Hadong Road. Meter. The entire line is arranged in the form of "elevated expressway+ground auxiliary roads". A pair of upper and lower ramps are arranged on the south side of the cement road and on the south side of Cement Road and the north side of Licai Street. Use), connect the main line and ground auxiliary road. The new prefabricated small box beam 88916 square meters, 11497 square meters of steel mixed combination beams, and 7,000 square meters of steel box beams.
The main line of the Beimen Street Viaduct adopts a two -way 6 -way lane in the basic lanes, with a total width of 25.6 meters, which is consistent with the scale and width of the lane of the main line of Binbei Line and the East Third Ring Express System lane.
Copyright Statement: Reproduced in any form without permission
Dragon Head News · Life Daily Reporter: Liang Chen
- END -
Korla local black wolfberry ushered in a bumper harvest pick season
In July, the black wolfberry planted by the towns around Korler matured one after ...
Suizhou optimize functional layout, build a garden city
[Source: Suizhou Municipal People's Government-Published by Suizhou]Follow Suizhou...