Due to rainfall, these bus lines are changed and shut down!Close here ...
Author:Shanxi Radio and Television Ra Time:2022.07.11
On the afternoon of July 11, the reporter learned from the Taiyuan Public Transport Group that due to the influence of rainfall, many bus lines in Taiyuan changed and stopped.
As of now, change the line:
The 821, 6, and 10 roads are detouring Wenxing Road in Xinghua Street.
Due to the accumulation of water in Xincun 304, he turned around at Xincun Village and dumped Xincun, Xiaobege North, Xiaobege, Geldling Station of the School of Industry and Commerce, and Beige Town.
615 Due to the stagnant water of Xinghua Street's Xiyong Road section, the stagnation of water is seriously detouring Qianfeng North Road, Pengxi Second Lane, Heping North Road, and the West Palace Return to the original line (going back).
827 Road detour Qianfeng North Road, Pengxi Second Lane, and Heping North Road Turntate (going back).
821 Tsuki Village has detoured Fen Southwest Road due to the accumulation of water.
856, 79, 301, and 317 Due to the serious traffic control of the water accumulation of Jinyuan New City, the 804 line is bypassing the 804 line, and Xinjin Temple Road, Yingbin Road returns to the original line. Chi Qiao, Jinyang Avenue, Zhenguan Street, Huata Village, Wanfu Road, Zhenguan Street, Wanshou Road intersection of Zhenguan Street, Jinyuan New Town (all go back).
606, 606, 618, due to the collapse of Shentanggou South Road, to go around the South Central Ring, West and Central Ring, Changfeng Street, Dumping Shentanggou Gel Station, Zhaigou, Xiyu Coal Mine, Kamitanggou North Road, City women and children.
Due to the accumulation of water in the river flooding viaduct, the 17th station of the old road was detouring the old road.
19 Due to the two -way stagnant water depth of the newly -built Lufuxi Street, walk straight to Jingangyan Road, Taoyuan North Road, and does not take the new road to Qiangxi Pass (go to Cheng Duo Dan West Pass) , Ghanxi Pass).
G7 Due to the accumulation of water at the intersection of Tanghuai Road at Zhengyang Street, dumping at the intersection of Tanghuai Road at Zhengyang Street, Zhengyang interface on Dachang Road, Yangzhuang West San Station.
901, 902, and 201 Due to the two -way stagnant water under the entrance bridge of Taiyu Road, walk on the bridge, and throw a station (Taiyu Road Xuefu Street). line.
The main line of 901 Due to the water accumulation of Yuebin Bridge, the 901 line lines are available, and the 901 line lines are left, and the Bank of China, Jinhua Hospital, IKEA Home, Yingbin Street Road, Wanya Jewelry, Sixth stop of Wanke Longjia Private City.
Due to the deep traffic control of South Railway Station, Guangming Road, Guangming East Street, turned around and throwing one stop of the South Railway Station of the train.
11. 836 Road under Taiyu Road Xuefu Street Bridge two -way water accumulation, walking on the bridge, throwing one stop (Taiyu Road Xuefu Street).
The 70th road return to Changfeng Street Dongzhong Ring Bridge has a severe water, and it is severely accumulated in the Dongfeng Road of Governor Feng Street.
On the 55th road, Cheng returned to the elevated elevator. Go to Chengzhongjie, Taiyu Road, Taiyu Road.
Due to Shuixi Gate 27, the water was built in the mouth of Xifu Xifu, and went to the back to bypass Shuixuan Street, Taoyuan North Road, Ghanxi Guan Street, west exit of Yangshi Street, Municipal Government, and New Luxu Xijie.
The 817 Civil Aviation Road has a serious water accumulation.
Due to the accumulation of water, the main line of the main line is bypass the traffic police team, and goes back to the back of the steel company, Zhao Zhuangnan, Zhaozhuang, Xincun, Xinzhao Road.
Due to Shuiximen in the 828 Road, the water is deep in the west of the new road, and it is changed to the original line of Fuxi Street, Taoyuan North Road, and Ghanxi Pass.
G7 Happy Homeland has a serious accumulation of water, around Zhenwu Road, throwing Happiness Home, Yabao Pharmaceutical, Tanghua intersection on Zhengyang Street, Tanghuai Road, Zhengyang Street, Zhengyang Street in Darong Road, Yangzhuang West, Shanxi, Shanxi Mobile, the intersection of Tangming intersection in Wuluo Street, Tongda Street Wucheng Road.
The water accumulation of water from the South Central Road in Changzhi Road, 825 Road, departing from the beginning of the 21st station, throwing the intersection of the revitalization of Changzhi Road, Changzhi Road (up and down) in the south and middle rings (up and down), Pingyang Road South Zhonghuan Street (up and down), Pingyang Road Gaoxin Street entrance (Up and down).
Due to Shuixi Gate 27, the water was built in Xifu Xifukou, and went back to bypass Yingze Street, Taoyuan North Road, Ghanxi Guan Street, throwing a new intersection, Yangshi Street West Exit, Municipal Government, and New Luxi Street.
Road 37, Due to the municipal drainage and sealing roads of Xincun, the 27th road is taken to Binhe East Road, Chai Village.
The 6th road is out of the small Dongliu to go to Wenxing Road in the North Central Ring, and the Yifen Street Bridge Xiyuan Line.
10th road out of Wenxing Road, Xiao Dongliu North, Xinhua Street, Jingangyan Road, and Fuxi Street.
At the 837th road, the water accumulated in Heiyu Village was serious. Lao Feng turned around and shook a stop of Heilu Village.
834 and 834 are closed under the Dongshe Bridge to bypass the Binhe West Road in Xinghua Street, North Central, and the west central ring restored the original line.
Due to the accumulation of water in Xinjin Road and Shuiximen, 809 cannot pass through. 809 changes offline from Qiaoying Street to Jiefang Road to take the liberation road left. Go up from Jongtou Street, take the none, Yingze Street, and restore the original line to the east of the bridge.
57 Road Longcheng Street cannot pass water. You need to turn right around West Lane and reply to the original line.
855 Due to the establishment of water in the new road, change the line to the liberation road, east tiger camps, the west gates, Yangshi Street west exit, the city government, the new Lufu Ximenkou, the dry west gate, and the west.
Due to the severe water area of Corning Street into a small shop, the road area of Kangning Street is severe. By around Grand Canal Road, drive to Zhengyang Street in Grand Canal Road, and go back to the south of Fuji Kang (Kangning Street Kucheng South intersection, Kangning Street Zhenwu Intersection, Renmin North Road, Xiaodian, Renmin South Road, Xiaodian Yucai Primary School, Huazhang West Street Estuary).
803 went up and down. Due to the accumulation of water on the mouth of Xinlufu West Street, he detoured the Fuxi Street, liberated intersection, east to resume the original line, dumped the west gate, and west of the tiger camp.
On the 50th route, due to the accumulation of water on Waya Street, he detoured Yifen Street and Heping North Road. During the Village of Waka Kayama, the Dormitory of the University of Technology, the Wan Berlin District Party Committee, the Great West District of Polytechnic. Due to the accumulation of water in Shangzhuang Street and Xinghua Street, it turned around in Xinghua Street in the west, Three Following Flour Factory, Puguo Road, Shangzhuang Street, Yuanjiazhuang, Xiazhuang, Geldling Station, Shangzhuang.
Due to the rainy stream of water in the 836, he turned around at the Electronic West Street Exit of Zhenwu Road. District Management Committee.
The pavement of Zaogou Village 202 collapsed, and it was not possible to pass normally. Xinghuayuan turned back and threw Zaogou Village, Dongping, Gengjiazhuang.
Due to the accumulation of water in Shuiximen Street, 808 Road, the trip detour the Taoyuan Road, Yingze Street, the youth intersection follows the original line, and go around Yingze Street, Taoyuan Road, Taoyuan Four Lane to run the original line.
858 Road to Cheng Yijing Street has a serious accumulation of water, around Qianfeng South Road, shaking Yoshing Street, Yoshii, 16 Middle, Xiyu West Street.
Due to the accumulation of water in Shuiximen Street, 808 Road, the trip detour the Taoyuan Road, Yingze Street, the youth intersection follow the original line, and go around Yingze Street.
858 Road to Cheng Yijing Street has a serious accumulation of water, around Qianfeng South Road, shaking Yoshing Street, Yoshii, 16 Middle, Xiyu West Street.
807 Water West Gate accumulate water, go to Cheng Yifen Street, Taoyuan Road, and Yingze Street drive back to the original line. Return around Yingze Street, Taoyuan Road, Yifen Street to return to the original line.
The 4th road outer ring has been built on the road. The water accumulates the road. It takes the liberation road, throwing the Sanqiao Street intersection of the Fuxi Street, the east street intersection of Banpo, Fuxi Street, the city government, the west exit of Yangshi Street, and Shuiximen Station.
The water accumulation of Jinyuan New Town 310 Road 310 is serious, bypassing Jinyang Avenue, Yingbin Road, Xinjin Temple Road, throwing Jinyang Avenue, Zhenguan Street, Hua Ta Village, Wanfu Road, Zhenguan Street, Wanshou Road, Zhenguan Street, Jinyuan, Jinyuan, Jinyuan New city.
The water accumulation of Changzhi Road in the south of the G7 Road is serious. It is the original line of the Asianri Street in the Industrial Road, throwing the Changzhi Road subway entrance, and the south of Changzhi Road.
The water under the south of the south of the 70th Road is serious. The return journey is bypassing Taiyu Road, shaking the University of Finance and Economics, the School of Justice, Xu Tanxi Street, and Shanxi University.
56 Road Dragon Street Zhuda Road accumulates water, bypass Longcheng North Street, and the original line of Pingyang West Lane restores the original line.
833, the AND special line, bypass the north central ring of Qianfeng North Road, and recover the original line by Heping Road.
Due to the serious accumulation of water at the intersection of King Nankong West Street, the city people's congress turned around. Nantong Street, South Road.
602 Road Chunshengyuan Community, Xinghua West Road Expressway, George Station, Dongshe West, Xinghua West Road West Central Ringkou, Dongshe East, Jinji South Gate, West Palace, Pengcun, Yifen Street, Yi Fen, Yi Fen Street Heping Road, Yifen Street Qianfeng intersection, 869 Road Dumper University of Science and Technology, Xizhuang intersection in the west Central Ring, Dongshendong, Jinji South Gate, Xiyong, Xinghua Street Qianfeng North Road.
615 Wan Berlin's greeting station was seriously accumulated. Without entering the parking lot of Wan Berlin, all returned to East Social East parking lot to depart.
As of now, stop the route:
S10 was temporarily suspended due to accumulated water.
Due to the accumulation of water in multiple sections of Sanfu Street and Coal Selection Street, the 82 Road stopped temporarily.
Due to the severe accumulation of water in electronic street sections, G5 was temporarily suspended.
The S9 Road was suspended due to the traffic control of Wenxing Road and San to the street water.
The 82 Road 82 was unable to bypass the depth of water in the three schools of Jinji Street and the coal selection street.
843, 915, 410, Y1, Y2 stopped due to the rain and fog.
303, 304, 305, 312, 881, 912 due to Corning Street, Huazhang Street, Dongqiao, Happy Homeland, Zhengyang West Street, Yudong Road and other sections of water depth depth, unable to pass, temporarily suspended.
K807 pause.
Tianlongshan.com stopped driving due to rain.
The line information is changed at any time, for details, consult 0351-7249876.
The Taiyuan Taishan Museum issued an announcement on July 11 that according to the emergency flood prevention requirements, the Taishan Scenic Area will temporarily close the park from now on, and the opening of the opening time will be resumed separately.
Public sue
Dear tourists and citizen friends:
Due to the recent heavy rainfall weather, according to the requirements of superior emergency flood prevention, Taiyuan Taishan Museum went all out to prepare for flood prevention. In order to ensure the safety of tourists, the Taiishan Scenic Area will temporarily close the park from now on, and the opening time will be resumed separately. If you cause inconvenience, please forgive me!
Special announcement!
July 11, 2022
Taiyuan Taishan Museum
The Tianlongshan Scenic Spot in Taiyuan City announced on July 11 that from now on, the Tianlongshan Scenic Area will temporarily close the park and restore the opening of the opening time separately.
Public sue
Dear tourist friend:
Affected by heavy rainfall weather, the risk of geological disasters in Tianlongshan Scenic Area increased. In order to ensure the personal safety of tourists and friends, Tianlongshan Scenic Area is temporarily closed. Open time to notify separately.
Please forgive me!
Taiyuan City Cultural Relics Protection Research Institute
Tianlongshan Grottoes Museum
July 11, 2022
The Jin Temple Scenic Area issued an announcement on July 11 that according to the requirements of the flood prevention work, the Jin Temple Scenic Area will temporarily close the park from now on, and the opening of the opening time will be resumed separately.
Public sue
Dear tourists and friends:
According to the notice of the Flood Control and Drought Resistance Headquarters in Taiyuan City, in order to effectively protect the safety of the lives and property of the majority of tourists, in accordance with the requirements of the flood prevention work, the Jin Temple Scenic Area will be closed from 15:00 on July 11, 2022, and the specific opening time will be notified separately. Sorry for the inconvenience brought to you!
If you have any questions, please call: 0351-6020038.
Taiyuan Jinci Garden Center
July 11, 2022
Comprehensive source: Shanxi Daily Taiyuan Taishan Museum Tianlongshan Grottoes Museum Jin Temple Scenic Area
Graphic production: Shanxi Radio and Television Finance Media
Want to know more exciting content, come and follow Shanxi Radio and Television Railway Media
- END -
up to date!What are the measures and control measures of the public in the province (return)?What is the policy of preventing and controlling the epidemic prevention and control of colleges and universities?Authoritative answers of hot issues →
/gWhat are the control measures for the management and control of Jinjin to ret...
Beijing catering company welcomes "Ganlin" 100 million yuan catering consumer coupon is about to arrive
According to the Beijing Municipal Bureau of Commerce on July 17, in order to accelerate the recovery of catering consumption in the city, according to the overall arrangement of the Beijing Consumpti