Shengli Street: Fighting "active battles", building a "flood prevention wall" | Dongying released

Author:Dongying released Time:2022.07.11

Shengli Street carefully studies the flood prevention situation, quickly, carefully, and comprehensively do various flood prevention work, continuously refine protection measures, and improve the flood prevention and mitigation knowledge, strengthen material reserves, enrich emergency forces, and important points of inspection, etc., and improve the flood prevention mechanism to ensure the flood prevention mechanism. Safety flood.

Popularize the knowledge of flood prevention knowledge to enhance the awareness of disaster prevention prevention

Recently, the Shengyue Community launched a publicity and safety publicity campaign to further improve the flood prevention consciousness and flood prevention capacity of residents in the jurisdiction. During the event, volunteers explained to residents to residents through the flood prevention leaflets, explaining the warning standards for heavy rain, risk aversion measures when floods came, and flood prevention safety knowledge such as thunderstorms. , Everyone participates in the good social atmosphere of "safe flood, everyone is responsible". (Wang Xiaomali)

The Ruida community grid staff notified residents in the jurisdiction to do a good job of waterlogging through WeChat groups, field visits and other methods, and remind residents to check the doors and windows to avoid indoor water in the room when it rains, causing unnecessary losses; check the window sills and balconies. Whether it is easy to fall and damaged items to avoid safety accidents such as high -altitude pendants in wind and rain; check out outdoor charging power supply such as cutting off electric vehicles to avoid electric shock. (Zhang Xiaojun)

Strengthening material guarantee to increase emergency duty

Recently, the Ruida Community Joint Property has carried out the preparation of flood control materials. The staff in order to fill in the flood control sandbags in an orderly manner. At the head of the building, prevent rainwater from entering the corridor of the residential corridor when preparing rainwater. (Pan Xue)

Jinhui Community reserve woven bags, wooden stakes, generators, water dragon belts and other standing flood control materials, and placed in the obvious positions of gatekeepers in various communities, clarify the principles of flood prevention materials management and call work, and regularly maintain the maintenance of flood control equipment. Strengthen the reserve of duty, requiring the personnel on duty to maintain a 24 -hour communication, in order to deal with the emergencies that appear at any time, strengthen communication and coordination with property, establish an information sharing mechanism, timely understand and predict the flood conditions, do a good job of various early warning responses. Once once, Emergency situations ensure reports as soon as possible, and organize flood prevention and rescue work as soon as possible. (Cao Mingyong)

Strengthen the investigation of hidden dangers to make precautions in time

The staff of the Jinming community and the volunteers of the party members conducted a comprehensive investigation of the low -lying dangerous areas, intersections, and sewer storage water in their jurisdiction. Lijing Community Grid members investigated the accumulation of water in the low -lying waterlogging point, sewer, households on the first floor, and roads in the jurisdiction. They reinforced the rainshield for key points, eliminated hidden dangers, and ensured safety during the flood season.

Shengjing community staff and grid staff surrounded the important sections and key areas in the jurisdiction to investigate safety hazards, focusing on checking the drainage pipelines of residential buildings in the area of ​​the district, gatekeeping pipelines, gates, drainage ditches, drainage pumps, flood control sand bags and other key disaster -prone sites. The joint property inspection of electricity safety, etc., in response to the hidden dangers of the investigated, urge community properties to rectify in a timely manner. (Wei Yanfang Chen Dongxia)

The staff of the Huize community conducted a carpet investigation of hidden dangers in key parts such as low -lying and water -accumulating water areas in the jurisdiction. Thorough investigation of the drainage port, basement, sewer, and water area water in various buildings in the residential building community for thorough investigation, and timely discover problems in time to deal with problems in time, so as to prevent problems before they occur. (Shi Yuhuan Qu Wenhua)

- END -

The maximum rainfall is 119.8 mm!All parts of our city do a good job of flood prevention and disaster reduction work

From June 26th to 27th, the fourth regional rainstorm weather process in our city appeared in our city. A total of 103 stations in the city were greater than 25 mm. The rainfall of 3 stations was grea

Phoenix Street: Use the "Lianxin Bridge" of the government and enterprises to build a good use of various benefits of enterprise policies

On the afternoon of June 23, the Secretary of the Party Working Committee of the P...