Aksey County Sixth Rolls strengthen water resources management to ensure sustainable economic and social development
Author:Aksai County Rong Media Center Time:2022.07.10
Since the beginning of the year, Aksey County has focused on the planning policies of "four grasping and one tie" and "water basin". The project planning and building management, implementing various work measures for the river and lake system, highlighting the operation and control of water conservancy facilities, water resource index control, water -drought disaster defense and wading ecological environmental protection work, standardize water administrative law enforcement, fully complete the complete completion Water conservancy fixed asset investment plans to further enhance the level of economic and social development and capabilities of water conservancy services.
Strengthen the operation and protection of water conservancy facilities. In accordance with the safety production regulations of the water conservancy industry, make every effort to do a good job of duty and inspections on duty duty and reservoir duty, and conduct comprehensive maintenance of water diversion pipelines, channels, and pipelines to ensure the safe and normal operation of water supply facilities and the orderly progress of farmland irrigation.
Strengthen water resources supervision. Implement the strictest water resources management system, implement water management of various industries, decompose the annual water indicators of various industries, establish a water ledger, and remind the water collection units to remind the water to take the warning due to the expiration to ensure that the water collection license delay handling work.
Strengthen the supervision of river and lake law enforcement. Release the work points of 2022 and the responsibilities of the head of the river and lake in a timely manner, and timely update the river and lake chief list and publicity sign information in a timely manner, and actively ask the river and lakes to perform duties at all levels, and the river patrol rate will reach 100%. Consolidate the effectiveness of the "Qing Four Chaos" of the river and lake, normalize and standardize special operations such as the rectification of the "four chaos", focusing on small and micro -edges, and illegal sand mining of the river. At present, there is no new "four chaos" issues and illegal mining in our county. Sand situation.
Strengthen the supervision of soil and water conservation. Strengthen the communication and connection with departments such as development and reform, industrial and information, sort out the county's development and construction projects, establish the water and water conservation supervision and management files for development and construction projects, and urge the development and construction project to report the report of the soil and water conservation plan (table) 4 copies (table), and collect the collection. The compensation fee for soil and water conservation is 7.2 million yuan.
Strengthen water and drought disaster defense. The main responsibility for the implementation of flood control tasks in key river sections and reservoirs, publicly announced the list of responsible persons, and concentrated time to carry out maintenance and commissioning of video stations, water level stations, and rainfall stations throughout the county, and increase the online rate. Strictly implement the 24 -hour duty system for the flood season, establish a major meteorological information exchange group, and timely release early warning information.
Strengthen the construction of water conservancy projects. In 2022, Aksai County implemented five water conservancy projects, involving funds of 64.873 million yuan, of which the ecological hydration project of the Duo Daigou flood storage ecological hydration project and the maintenance and reconstruction project of the Dapita ditch drainage channels have now completed the main construction task of the main body and are undergoing subsidiary facilities. Continuously build the Templar Tail Mine Circular Economic Industry Park storage tank project, which has completed all construction content and put into use; the water resources management project has completed the installation of water resources measurement facilities and is carried out for debugging; Village people drinking water pipes were fully completed in May.
- END -
Black Tao Xing: The "Song of Mud and Fire" by ingenuity
In the morning in the rain in the summer, Rizhao Old Town raised the wet and wet w...
The man worked for 19 years to become a tramp in the streets of Dongguan. Fortunately, the volunteers discovered him ...
19 years after going out to work, Li Wenbin finally returned to his hometown in Na...