Water supply staff compete for 8 hours, just to do not affect citizens to make dinner for dinner
Author:Pole news Time:2022.07.08
Jimu Journalist Pan Xizheng
Correspondent Qin Yue
Intern Xiang Yuchen
"When I went out in the morning, I found that the water was stopped at home. I did not expect that I will recover after going home from get off work in the afternoon. Like the water supply and repair personnel!" On the 7th, Mr. Liu, who lives in Baofeng Second Road, Hankou, Wuhan, expressed the hotline of the news news. Essence
Mr. Liu told reporters that on the morning of the 7th, he found that the water was stopped at home, and when he went to work, he saw water supply staff on the street. "Can I have water to cook and take a bath when I go home from get off work?" He entered the extreme news hotline, expressing his concerns about reporters.
After receiving the hotline, Jimu Journalists rushed to the scene at 3 pm. Seeing a number of water supply staff on the road near the air community of Baofeng Second Road is being repaired. "Now the repair work has basically reached the end. After we conduct a test pressure, we can restore the water supply."
Repair site
According to the staff of the Hankou Water Supply Department of Wushui Group, at 7:30 am on the 7th, they received information that residents around Baofeng Second Road reported that the water pressure was low or no water available. The staff immediately went to the scene to check the surrounding main pipelines, and inspected the water supply facilities such as nearby valves.
During the pressure measurement process, the staff found that the pressure value dropped from 2.6 to 1.4 from Baofeng Road to Baofeng Hotel. There is a dark leak.
In order to check the leakage point as soon as possible, the leakage personnel at the Hankou Water Supply Department quickly arrived at the scene. On the top of their heads, a pipeline of the Paofeng Hotel's entrance was performed one by one for an hour in a row. After inspection, the staff found a lot of water at the entrance of the air community, and the leakage point was nearby. Then he captured the leakage sound on the pipeline through the hearing rod and other equipment, and the drilling was checked to determine the leakage point.
After determining the omissions, the maintenance staff immediately organized machinery to rush to the scene, and coordinated the excavation construction with traffic management and urban management departments simultaneously. After the excavation, they found that the problem was not just a dark leak, but the bottom of the pipeline was completely ruptured. If it was not repaired in time, it would not only affect the surrounding residents' water, but also it is also likely to have a greater impact on the road surface.
Repair site
"Although the temperature on the road is as high as 40 ° C, everyone still holds their teeth and insists on the restoration of water supply before dinner, hoping not to affect the citizens' cooking, bathing and water at night." After the work, after the pressure test, the water supply was restored at 4 o'clock, and the whole process was only 8 hours.
That night, Mr. Liu, who was in the hotline to reflect the stopping water, reported that the reporter said: "After going home from get off work in the evening, we found that the water supply at home has been restored. Such a hot day, thanks to the water supply personnel for the cinellus, otherwise we will find a place to eat and take a bath. . Praise for them. "
(The picture is provided by the correspondent)
- END -
Yongji City: Broadcasting clean seeds, newcomers in the period of education
Shanxi Daily's new media reports: Cleaning culture enters the campus, bacon casts ...
Judge the return!"Zhang Gong's ancestor" sitting in the second instance of the Buddha statue to maintain the original judgment
On the morning of the 19th, the Fujian Higher People's Court followed the law to t...