Xinjiang strictly regulate temporary land management

Author:Tianshan.com Time:2022.07.07

Tianshan News (Reporter Wang Yayun) Recently, the Natural Resources Department of the Autonomous Region issued the "Notice on Further Regulating Temporary Land Management", strictly standardized temporary land management, effectively strengthened the protection of cultivated land, and promoted conservation and intensive land.

According to reports, temporary land management has played a positive role in ensuring construction project construction and geological exploration. Inadequate and other issues.

The "Notice" pointed out that in principle, temporary land shall not occupy permanent basic farmland and ecological protection red lines, and those who need to occupy permanent basic farmland must be able to restore the original planting conditions and meet the relevant regulations; Red line management regulations. Temporary land should be scientifically selected scientifically, try not to occupy or take less cultivated land, and can use non -arable land and do not occupy cultivated land; those who can use inferior cultivated land can not occupy high -quality cultivated land; In order to occupy a cultivated land and permanent basic farmland in a temporary land use manner, the land can be used to build land or temporarily occupy the land.

The "Notice" clearly states that the scope of temporary land includes: the temporary office and living houses that directly serve the construction personnel during the construction of the construction project, and the self -use auxiliary project of the project that directly serves the project, as well as the foundation of energy, transportation, water conservancy and other foundations The land for facility projects, the land abandoned (residue) field, etc. are used; mineral resource exploration, engineering geological exploration, hydrogeological survey, etc., during the exploration, temporary living rooms, temporary work sheds, exploration operations and its auxiliary projects, construction, construction, construction, construction Land used in the stool, transportation roads, etc.; archeological and cultural relics protection construction site construction temporary cultural relics protection facilities, construction site safety facilities, logistics facilities, etc.

The "Notice" requires that it is strictly approved and used in accordance with the scope of use, and the use of land for construction and geological exploration such as construction projects and geological exploration can not be returned to the place of land or recovered after use. And use temporary land; no agricultural land use and land acquisition shall be avoided in the name of temporary land use.

The "Notice" emphasizes that if the construction project construction and geological exploration need to be used for temporary land, the city and county natural resource authorities are approved by the land where land is located; The competent resource department is responsible for approval and shall no longer decentralize or entrust temporary land for approval. The period of temporary land use is calculated from the date of approval and generally does not exceed 2 years. The construction cycle with long construction cycles and temporary land for infrastructure construction and other infrastructure construction shall not exceed 4 years. Except for other provisions of laws and administrative regulations.

The "Notice" also clarifies the content of the rights and interests of the relevant rights, the supervision and management of land reclamation and the supervision of policy execution.

- END -

Henan Zhumadian: Tongxin resistance to disease, grateful to you

On July 20, the staff of the Xinyang Streaming Team, who supported the epidemic pr...

High temperature is coming, why are the British restless air conditioning?

[Global Times Special Journalist Ji Shuangcheng in the UK] Britain entered a rare ...