Guiyang Rail Transit S1 line in and out of the section line cap

Author:Colorful Guizhou.com Time:2022.07.07

On July 4th, with the completion of the last part of the concrete, the in -section line of the S1 line of the rail transit was capped, and the node project was completed on time.

The inlet section of the rail traffic S1 line crosses Jing'an Avenue with a length of 550 meters. After the section of the saponin dam vehicle in the interval line, it turns north to east radiation.As the first assistant engine of Guiyang Gui'an integrated urban development, after the completion of the S1 line of the rail transit, the rapid connection between Gui'an's core area and Guiyang City will meet the needs of the North -South fast travel in Guiyang City, and guide the population and urban functions of the main urban area.Exchanges from the New District to achieve the development of the same urbanization of the main urban area and the Gui'an New District.

Source: Guiyang Metro

- END -