Multiple measures to escort the power grid welcoming the peak summer
Author:Jiuquan Daily Time:2022.07.07
"We must strengthen the inspection of line channels, tower ontology, and golden gear to ensure that no equipment is not allowed, leaving a hidden danger ..." On July 5th, the State Grid Gourd County Power Supply Company organized operation and maintenance personnel Internal important circuits and key equipment are carried out for special patrols, in -depth investigation of hidden defects, and ensuring that residents produce and live electricity during peak summer.
Since the summer, the load of Guzhou Grid has continued to rise, with a daily maximum load of 77,800 kilowatts, an increase of 26.1%year -on -year. It has brought great challenges to the safe operation of power equipment. The high and low voltage lines, power distribution transformers, etc. are conducted in a comprehensive and detailed inspection, and the focus is on tracking the temperature measurement of the device, the knife gate contacts, the knife gates, and the touches of the carrier area, the low -voltage platform area, the high -load residential area and the important customer line equipment. There are no temperature abnormalities such as the temperature of the cable head head, and the equipment operation is in time. Establish a detailed table of infrared inspectors, record data such as testing time, temperature, line temperature, and load, and organize, archive and analyze the results of the inspection, and provide data support for future related work.
On the basis of strengthening equipment lean management, the company strengthens the management of regulatory operation, regulates personnel closely monitor the load of the power grid, scientifically and reasonably arrange the operation method of summer grid, timely adjust the operation method of high load lines, and make a weak power grid weakly. The pre -control measures in the link actively cope with the rapid growth of electricity load. Organized scheduling on duty officers to carry out the 2022 Complex Summer Joint Anti -accident exercise. In response to problems exposed during the exercise, carefully analyzed and research countermeasures, and effectively improved their ability to respond to emergencies.
At present, the company has carried out 346 infrared temperature measurement in 10 kV lines, 43 diligently measured loads, eliminated 31 hidden dangers, and the work of peak summer is underway. In the next step, the company will combine the experience of peak summer work in previous years, continue to carry out lean inspections of the line, and "diagnose" the health status of the equipment in advance, so as to patrol the side, serve the heart, propagate, and rectify the closed loop to ensure the peak degree During the summer period, the power grid is safe and stable, and the masses are reliable. (Li Tingting Song Jiajuan)
Editor in charge: Tian Xue
- END -
Panzhou Natural Resources Bureau issued geological disaster weather risk orange warning [level/serio
Panzhou City Emergency Bureau, Natural Resources Bureau, and Meteorological Bureau June 10, 2022 jointly released geological disasters Meteorological risk orange warning signals: Affected by the early
To continuously upgrade to make the industry and platform more prosperous
With the development of blockchain technology and the popularization of the concept of meta -cosmic universe, the global digital copyright trading market has continued to become popular, and domestic