Suqian Airlines Center Dahe Boat Gate: Actively respond to flood discharge and affect multiple measures and help safe production

Author:Suqian.com Time:2022.07.05

On the morning of July 4th, the Sumki Boat Lock at the Suqian Airlines Center received a notice from the Provincial Defense Office. The flood discharge flow of the soap river gate reached 600 cubic meters per second, the upstream water level was 22.35 meters, the downstream water level was 19.25 meters, and the water level continued to rise. Continuous flood discharge and recent heavy rainfall weather always affects the safety of ship navigation and the normal operation of the ship gate. The flood situation is the order. The gate immediately held a special deployment meeting to formulate the layout and arrangement of emergency work in detail.

Strengthen information communication. At the first time, the flood prevention and weathering department's early warning prevention and control information, coordinate with water conservancy and maritime affairs, timely understand the changes in flood discharge flow, and use the "Shipwreck" APP, telephone and other methods to release the flood discharge location, time, time, time, time, time, time, time, time, time, time, time, time, time, time, time, time, time, time, time, time, time, time, time, time, time, time, time, Information such as traffic and water levels will increase the safety propaganda such as water and navigation conditions, remind past ships to actively cooperate with water traffic control, plan navigation routes, pay attention to sailing, mooring safety, and take their own safety protection measures.

Strengthen on -site management. Increase the frequency of cruise of the navigation boat, maintain the order of the channel, publicize the relevant provisions of the traffic during the flood season, and remind the ships in the flood channel to strengthen the vessels to strengthen the cable and anchor inspection. There is a need to help the first time. On the other hand, the gatekeeper on duty enhanced the observation when entering and exiting the gate, conducting forward commands, from the ship entry into the channel of the guide channel to the entire process of the ship out of the ship. Drive carefully to ensure the safety of the ship through the gate.

Check the hidden dangers. Organize special safety inspections of mechanical mechanics and electrical equipment, strengthen the investigation of hidden dangers of ship locks and navigation facilities, especially check the operation of the gate of the ship gate control system, the operation of the opening and closed aircraft, and the lubrication and fastening device one by one to ensure the safe and orderly operation of the ship gate. Do a good job of inspection, improve the account records, replace and maintain damaged facilities in time, check and supplement flood prevention materials.

In the next three days, there will still be rainfall in the Suqian area, and the flood prevention situation will still be severe. In this flood control "tough battle", the institute will continue to strictly abide by the flood prevention positions, tighten the production strings, and provide a solid guarantee for the life and property safety of the crew. (Sun Hongliang)

- END -