Xu Tiegang: Be a good financial investment "gatekeeper" and run out of the review "acceleration"

Author:Wangcheng District Rong Media Time:2022.07.05

In the past 15 years, he adhered to the principles and bottom lines of the financial evaluation work, with the "drill" strength of Lei Feng's "nail spirit", and the hard work and tenacity of Lei Feng's hometown, he firmly "nailed" himself in his post, seriously serious Study hard work. He uses strict standards to ask himself, serve the project with a sincere attitude, and save good funds for the government, and save funds for finance. He is Xu Tiegang, the assistant director of the Financial Branch of the Wangcheng Economic Development Zone and the director of the Investment Review Center.

When talking about his own work, Xu Tiegang said: "I work in Lei Feng's hometown, and my responsibility is to let every fiscal fund here use it on the blade." He said so, and did that.

The "open road pioneer" that is brave and burdened

In 2007, due to the development of the park, the Investment Evaluation Center of the District Finance Branch was established in Wangcheng District. At the beginning of the start, the center was only Xu Tiegang. Because various tasks were blank and nothing were fine, he participated in all the establishment of the center.

"Every career and every task requires someone to do it. The organization thinks that I can play a role in this position, and I will obey the arrangement without hesitation." After entering the review center The center continues to promote refined and scientific management of financial investment review, and strives to build an institutional system with clear power and responsibility, procedural standards, smooth relations, and effective operation, and build a professional, honest, united and cooperative team.

Last year, the newly formulated "Implementation Rules for the Administrative Measures for Investment Review (Trial)" (hoping to open the management [2021] No. 2). From the aspects of improving the quality of review and the efficiency of the review, it further clarified the duties of each position and responsibilities to the good park. The role of the project management goalkeeper has been well received by departments at all levels.

With the best review service, the fastest review time, and the best judging effect to pursue, Xu Tiegang took the initiative to find problems, carefully summarized the problem, achieved other categories, and regularly combed the common problems of each stage, majors, and positions of the unit, and formed a formation, and formed Internal standardized review process, caliber and standards, continuously innovate and deepen project review methods, and improve the performance of financial funds.

"Struggling Soldiers" who welcomes the difficulties

If finance is a big housekeeper, the investment review is a "iron abacus" in its hand. Due to the huge investment in investment review, there are many types of projects, especially when the project is increasing annually, it is normal for a person to review a large number of projects at the same time. However, no matter how difficult the problem is in the face, Xu Tiegang always faces the difficulties, like the clock that tightens the clockwork, and keeps glowing at work at a moment.

In 2017, Wangcheng put the investment review rights of large projects to the Investment Review Center of the Financial Branch of Wangcheng Economic Development Zone. Xu Tiegang, who was only responsible for the evaluation of small and medium -sized projects, had a dramatic workload and greater responsibilities on his shoulders.

In 2018, in the budget review of BYD Electronic Project in Changsha Smart Terminal Industry Double Incubation Base Project (Phase I), Xu Tiegang led the other personnel of the evaluation center to strictly control and comprehensively approved the project fee, project list, and material prices. In strict accordance with the established procedures, no mistakes are not allowed, and overtime overtime is overtime for seven consecutive days. In just 22 days, the budget review work of 1.4 billion yuan projects was completed, and the project settlement review was completed in 9 months.

"The people of the park should be less stable step by step, and the more they dare to work hard, the more urgent and dangerous, the more they must show their responsibilities." Xu Tiegang said that investment review is the first gateway to the project, and it is also the end of the project to end the project. The last portal must be a good person.

As of 2021, Xu Tiegang has completed more than 1,200 review projects, with a review amount of about 13.5 billion yuan, and reduced financial funds of approximately 1.4 billion yuan, effectively curbing the government investment of super budgets and super standards, saving a lot of financial construction funds.

The fiscal funds are true "abacus"

The original intention of investment review lies in the efficiency of increasing efficiency and prevention of corruption. As the manager of government funds, Xu Tiegang has always used a relatively real and honest attitude to make "iron abacus" for government projects and keep up with "money bags".

Facing the establishment of the Wangcheng Economic Development Zone, rain and sewage pipelines are obsessive, and the entire district has not done similar large -scale dredging projects. When the unit price is not drawn, Xu Tiegang has visited the project site many times to learn more about the construction process. Carefully record the working time and efficiency of the mechanical, mechanical work, collect and organize data in combination with internal industry, and in accordance with the latest pricing methods and consumption standards in the provincial quota station, finally determine the "Silee Dredging Single Price in Rain Sewage Pipeline", which obtains the District Audit Bureau and the District Finance and Evaluation Center The recognition of the district municipal bureau is promoted within the scope of Wangcheng District.

But once Xu Tiegang worked, he was very desperate, and he could not take a rest for a long time. During the physical examination in 2018, Xu Tieang was diagnosed with rectal cancer. After surgery and eight chemotherapy, he only rested for one month, and returned to his job to work in the front line of review.

"We all hope that he can rest for a while, but he said that many work tasks and tight time cannot affect the overall work progress because of his personal reasons." Speaking of colleagues Xu Tiegang, Tao Hongzhou is full of distress.

- END -