Chaozhou East Link to realize the dual -amidity project throughout the line into the road construction stage

Author:Chaozhou released Time:2022.07.05

Yesterday, the reporter learned from the Chaozhou East Construction Management Office of the Chaozhang Expressway that at present, the Jinpingling Bridge of Chaozhou East Link has completed the last prefabricated beam stand, marking the double -range of the main line of the Chaozhou East Link. During the sprint phase, it laid a solid foundation for the completion of the traffic at the end of this year.

The Chaozhou East Link is a key project in Guangdong Province's "high -connection high". It is about 6.3 kilometers in length and is roughly north -south. It connects the existing highways of Shenhai and Yongguan. The project is located in the coastal mountainous areas with many typhoons. It belongs to a typical mountain highway. The geological terrain is complicated and the bridge and tunnel ratio is high. Some pile foundations are located on the steep slope surface with a height difference of nearly 100 meters. Since the construction of construction, the project has overcome difficulties and key issues such as the complex and changeable geology of the tunnel, the high risk of high -pier construction, the tight transportation period of the auxiliary road, and the difficulty of high -voltage movement and coordination. Project "Ping An Site" typical project.

At present, the project is undergoing road construction strictly in accordance with the time node, and sprints at the end of the year at the end of the year. After the project is completed and opened to traffic, the two major traffic arterys of Shen Hai and Yongguan will be interconnected. The traffic route along the line will be further optimized. Liaison has an important role. (Chaozhou Daily reporter Liang Jiatao)

- END -

"Who leaked my express information?" The black hand behind the scene was ...

Why do the scammers know what I bought?Who leaked my express information?Believe a...

Latest notice of the National Health and Health Commission: New local: 7+15

At 0-24 on June 24, 31 provinces (autonomous regions, municipalities) and Xinjiang...