PetroChina's first waterfall
Author:China Chemical Newspaper Time:2022.07.05
On July 1st, the first photovoltaic project of Petroleum Petroleum -Daqing Oilfield Star Water surface photovoltaic demonstration project also marked the comprehensive speed of the development of the new energy business of Daqing Oilfield.
During the "Fourteenth Five -Year Plan" period, Daqing Oilfield strived to build a green and low -carbon sustainable development demonstration base. The scale of new energy installed capacity reached more than 2 million kilowatts, and the clean energy replacement rate reached more than 20%.
According to Wang Jun, manager of the Strategic Development Department of CNPC, the photovoltaic project of the Daqing Oilfield Star Water surface uses two water surfaces, with 400,000 square meters of construction land, 18.73 MW in installation, an average annual power generation of 27.5 million kWh, and 22,000 tons of carbon dioxide reduction. Essence From the completion of the project to the completion, it only took more than 4 months to achieve efficient production as scheduled.
The photovoltaic demonstration project of the Daqing Oilfield Star Fire Water surface, as the first water -policies of Petroleum Petroleum, completed the successful exploration of independent design and construction of water surface photovoltaic photovoltaic. Take a key step in the development journey. It provides solid technical reserves and useful construction experience for the development of various new energy projects.
- END -
To deal with the typhoon "Siaba", 2026 people in Guangzhou transferred in the dangerous area in advance
The first typhoon Siaba that landed in our country this year has weakened to a tropical low pressure, and the central wind is 7 (16 meters/s). On the 4th, the reporter learned from the Municipal Eme
Wuhan ten departments jointly introduced to promote new energy vehicle consumption policies
The Yangtze River Daily Da Wuhan Client June 26. Recently, Wuhan's ten departments jointly issued the Wuhan City Promoting New Energy Vehicle Consumption Work Plan (referred to as the Work Plan),