Wei Jianping: With "rain" as the "flood", he will fully guard the safety of the masses and the city.
Author:Plains Evening News Time:2022.07.04
On July 3rd, the urban flood prevention work conference was held to deeply analyze the shortcomings of the problems exposed in the urban flood prevention work since the recent period, further clarify the urban flood prevention command system, compact the duties of flood prevention of all members, comprehensively improve the emergency response disposal of the city Ability to ensure the safety of the urban area this year. Mayor Wei Jianping and deputy mayor Chen Hongyang attended the meeting.
Wei Jianping pointed out that the flood prevention of the urban area is related to the economic and social development and the overall situation of security and stability, and it is related to the safety of the lives and property of the people. It is necessary to unify command and coordinate and link. The urban flood prevention headquarters shall issue a mobilization order in a timely and accurately according to the weather forecast and early warning information pushed by the meteorological department. Each member unit shall immediately respond and act quickly, and resolutely obey the command of the headquarters. The system is maximized. It is necessary to clarify responsibilities and take the initiative to take responsibility. The flood control system in the urban area is a huge system that involves meteorological early warning, hidden danger investigation, pumping station drawing, river canal management, power communication guarantee, and other departments. Each member unit must carefully study the content of the urban flood control organization command and emergency treatment system. Take the initiative to take responsibility for responsibility, and carry the responsibility for the rescue of their respective flood prevention. Walk to the "flood" and "Ling". After receiving the flood prevention instructions, the members of the headquarters must go to the place as soon as possible, and immediately carry out disaster relief, metastasis, and hedging. Strengthen publicity and education, guide and mobilize the masses to actively participate in flood control and rescue and disaster relief work, work together to build a disaster prevention and reduce defense line, and jointly protect beautiful homes. To check the omissions and make enough homework. In response to the problems exposed during the heavy rainfall process some time ago, according to a net standard of clearing the road within 2 hours of a rainfall process within 2 hours and 100 mm 5 hours, supplement the shortcomings of flood control and drainage in the urban area as soon as possible to ensure flood control equipment and facilities and facilities Safe and efficient operation. Based on the current long -term, combine the bidding and the root cause, combine emergency engineering construction with long -term engineering construction, and comprehensively eliminate hidden dangers of flood prevention. It is necessary to ensure the supply of "water and electrical" and ensure the normal operation of the city. Comprehensively investigate and clean up various types of safety hazards, and make every effort to ensure the safety of municipal public facilities such as water supply, power supply, gas supply, communication, and corporate heating, ensure stable production of enterprises, and stable and orderly mass life.
(Xinxiang Daily All Media Reporter Zhao Gairong)
- END -
The innovation and challenge of quantitative social research methods in the era of big data
The arrival of the era of big data not only deeply affected people's understanding of the social world, but also provided great possibilities for the innovation of quantitative social research methods...
On July 23, the heat of the heat, as the saying goes, "Daing a treasure in the summer, there is no trouble in peace", what is it?
A big kiln in heaven and earth, yang charcoal cooks in June. Everything is melted ...