A Huahu Airport builder and his 665 friends circle

Author:Changjiang Daily Time:2022.07.03

Ezhou Huahu Airport is about to be navigable

Behind the wings

Can't do without the hard work of the builder

Looking back at the construction process of the airport

Let's use the perspective of a builder

Take a look at the volatile of this road

↓↓↓

"My 665 Friends Circle"

My name is Luo Liang

A builder of the third bureau of China Construction has 665 friends in my mobile phone about the circle of friends about Ezhou Huahu Airport. It is my most memorable memory in the past four years.

Ezhou Huahu Airport is the first and fourth professional freight hub airport in Asia, and is the "number one project" in Hubei Province.

Among them, the third bureau of China Construction, as the main participating unit, undertake six projects including the governance of the Malaysian Water System, the air pipe tower, the terminal, and the freight station.

图片

图片

On August 30, 2018, the management project of the Malaysian Water System of Ezhou Airport started the construction of a swamp and the average thickness of the mud in the deserted slopes of 5 meters.

我们团队率先进场开展水治理和场平作业,采用“排水固结”的方式有效化解软基处理的难题,并积极推进数字化施工,大胆探索“无人驾驶”、“无人监控”、“ Intelligent pumping "and so on, realize digital supervision of more than 600 operation equipment on the spot.

图片

图片

March 30, 2020 started construction

The tower is the command brain of the entire airport. Here we cover the BIM application to all aspects of construction management.

图片

图片

Terminal at the airport

Self -service consignment and self -service security checks are all shining through 1348 pieces of ultra -white dual silver hollow glass, making the inside of the hall particularly spacious and bright.

In August and September 2020, terminals and freight stations started. We used the smart construction platform to conduct a diagram based on the BIM model to guide the refined construction on the site.

图片

图片

The most proud thing is that our Ezhou Huahu Airport is the first airport in the country to use digital construction in the country, and has been listed as the first batch of "type 4 airports" demonstration projects for the Civil Aviation Administration.

In the past 4 years, we grabbed sunny days and rainy days. Here we staged the Ezhou version of the "Yugong Yishan" and "Essence Foundation of the Sea". There were also a number of outstanding young people such as "Taoist" Ye Dong and "Iron Man" Ma Yang. Practice the responsibility and responsibility of the youth in action.

图片

Four years of hard work, 665 circle of friends, harvesting tens of thousands of likes, including owners, leaders, colleagues, and relatives and friends. Each circle of friends is the footprint of struggle every time every time I like a youthful memory, and the heavy task is to be grateful for the "construction certificate" in the new era.

Produced: Ezhou Rong Media Center Material Source: China Construction Third Bureau Editor: Xiong Wei blame the school: He Fen duty head teacher: Zheng Bo produced: Liu Lianzhen

For more exciting content, please download the "Da Wuhan" client in the major application markets.

- END -

Literary works | July Half Memory

The author checks the growth of white tea (Chen Ming/Photo)July 15th of the lunar ...

Official announcement!Just now, New Hunan is on the new!

In the vibrant June,New Hunan new version 9.1 version is launchedIn the blink o...