Cangba high -speed God Temple tunnel right hole runs through
Author:Xinhuanet Time:2022.07.03
Xinhua News Agency, Beijing, July 3rd. On the 3rd, a reporter learned from China Railway Construction Co., Ltd. that the Cangba Expressway's first -grown tunnel of Cangba Expressway, which was built by the China Railway 15th Bureau, smoothly penetrated the right hole of the Tunnel of God Temple.The Pakistani Highway has laid a solid foundation at an early date.
According to Song Hongshui, the person in charge of the third company project of the China Railway 15th Bureau Group, the design standard of the Tunnel Tunnel of God is a two -way four -lane highway, with a total length of more than 2,300 meters and a maximum burial depth of about 242 meters. The geological conditions of the tunnel are complicated.One of the key control projects of risk.
The total length of the Cangxi to Pakistan highway is 78.9 kilometers. It is an important part of the Cangba Expressway. It is the Sichuan Grand Channel in the northeast of Sichuan.After the opening of the traffic, a new outlet will be formed to further improve the regional traffic road network.
[Editor in charge: Wu Yongling]
- END -
There are some small shops in Yangpu, keeping the fireworks on earth, "sweet" for a whole summer
Small shops are always closely related to people's daily life.On the streets and p...
Thunderstorms and strong precipitation are here!
Heilongjiang Meteorological Observatory issued a strong convection forecast at 137, 2022: It is expected that in the next 6 hours, all districts and counties of Gagdagi, Homa, Health, Lahe, Gannan, Yi