alert!Just now, Guigang City launched a defensive typhoon IV emergency response

Author:Guigang Daily Time:2022.07.02

Notice on launching the Defense Typhoon IV emergency response of Guigang City

All counties (cities, districts) flood prevention and drought resistance headquarters, municipal flood prevention drought resistance headquarters:

Typhoon No. 3 "Siaba" (strong tropical storm) is located on the sea about 185 kilometers in the southeast direction of Zhanjiang City, Guangdong Province today at 06, 20.2 degrees north latitude, 111.7 degrees east longitude, and the maximum windy level near the center (30 meters/second ), The lowest air pressure of the center is 975 hundred Pache. It is expected that "Siaba" will move northwest at a speed of 15 kilometers per hour, and the intensity will be slowly enhanced. It will be landed in the coast of Yangjiang, Guangdong from Yangjiang, Guangdong at noon. Or a typhoon level, 11-12 levels, 30-33 meters/s), and continue to move northwest after landing. It will enter Guangxi from Yulin to Beihai tonight (strong tropical storm level, level 10, 28 meters/second). Affected by Typhoon No. 3, there will be strong wind and rain in our city in the next three days. Most of them have heavy rain to heavy rain, local heavy rain, wind power 5-6, and gusts 7-8. Guigang Meteorological Observatory issued a typhoon blue warning signal at 7:58 on July 2.

In view of the typhoon "Siaba", it will bring heavy rain and windy weather to our city. According to the provisions of the "Defense Typhoon Defense Typhoon Defense Typhoon", it will be discussed and judged by the city's flood control and drought resistance headquarters. Start at 10:00 to start the Defense Typhoon IV emergency response in Guigang City.

All counties (cities, districts) and member units are requested to attach great importance to implementing various defensive measures in accordance with the division of responsibilities, pay close attention to the development of typhoons, roll out the forecast early warning and risk aversion prompts, and hurry up to carry out important facilities, weak wind resistance links, and weak wind resistance links. The risk investigation and rectification in the flooding area, close the scenic area in advance, construction sites and transportation routes, and take measures to stop work, stop industry, stop production, and suspend classes; , Cut the Houses and other dangerous areas such as the transfer of dangerous areas, and do a good job of controlling the safety control of the transfer personnel; do a good job in the wind prevention of the municipal government, strengthen or remove the simplicity of the iron house, the wall, the sidewalk tree, the billboard, the glass curtain wall, etc. easily collapsed or falling objects; Strengthen the defense of geological disasters of mountain floods, and give full play to the role of monitoring and early warning of grass -roots flood prevention and platform prevention system prevention systems and flood disaster prevention and treatment systems. Once the signs of danger are found, decisively transferred to the threats of the masses; Flood prevention and drainage measures such as shopping malls and sinking interchange bridges; preset rescue and rescue forces, prepare for flood prevention and rescue materials, timely rescue disaster relief and reporting related information to ensure flood prevention and prevention.

Guigang City Flood Control and Drought Resistance Headquarters

July 2, 2022

- END -