Dongying Port accelerated the construction of a natural disaster defense line to ensure the safety o
Author:Qilu.com Time:2022.06.10
Qilu.com · Lightning News, June 10th. Since this year, Dongying Port Economic Development Zone has been based on preventing floods and anti -disaster. Resist the natural disaster defense line, do all the preparations before the flood, strengthen inspection patrol and material reserves, and quickly check the leakage and supplement for the weak links of flood prevention and disaster relief. The district flood season is safe. The total length of the seawall in the Dongyinggang Economic Development Zone is 21.57 kilometers, which plays an important role in resisting storm trends and preventing seawater invasion. After the completion of the embankment project, in order to reduce the damage to the seawall in order to reduce the tide, waves, and some other factors, the Dongying Port Construction Investment Co., Ltd. has always tightened the safety strings, organized and coordinated at high standards, clarified the task goals, increased the frequency of inspection, strengthened the frequency of inspection, strengthened the frequency of inspection, strengthened the frequency On -site guidance, timely control and exclude danger to ensure the safety of the embankment.
Li Zhiguo, the person in charge of Dongying Xudong Municipal Seafood Inspection, said that they will continue to inspect the entire seawall 24 hours a day in accordance with the process and safety requirements every day, every Wednesday every Wednesday, every Wednesday The next comprehensive inspection, confirmed the daily inspection records, and implemented the various problems found during the inspection process to the maintenance confirmation form to ensure the safety of the entire seawall.
Since the beginning of this year, Dongying Port Economic Development Zone has accelerated the construction of the defense line against natural disasters, paid an eye on weak links, implemented various preventive measures, and made materials in advance reserve. According to the characteristics of the embankment design, analyze and judge the insurance parts and sections, preset rescue forces and materials, and make preparations for emergency protection in advance; strengthen daily inspections, organize professional teams, do a good job of drawing dyke inspection, guarantee without leaving no leaving Gelish, no dead ends, encrypted key sections, key parts, and dangerous workers, especially historical insurance segments, ensure early discovery, early processing, and early consumer insurance; strengthen warning and publicity, set up warning signs, and remind the masses to prohibit crossing through crossing The embankment is prohibited from the water -related activities such as water and fishing. At the same time, it will publicize the safety knowledge of the seawater through the distribution of leaflets and other methods, do a good job of safety prevention and publicity, and enhance the sense of safety of the masses.
Lightning journalist Wang Daijie Dongying City Radio and Television Bi Haoran Road Ping reported
- END -
The Huangguo Tree Scenic Area has stopped ticket sales, and the number has reached saturation
The reporter learned from the Huangguo Tree Scenic Area in Anshun that at 13:00 on...
The National Health and Health Commission issued the "Guidelines for the Diagnosis and Treatment of Children's Severe Acute Hepatitis (Trial)"
Xinhua News Agency, Beijing, June 16 (Reporter Xu Penghang) Since March 2022, many countries and regions around the world have reported the serious acute hepatitis in children for unknown children. Th