Linyi City Highway Business Development Center
Release public information:
The western section of Jiefang Road is widened! Intersection
West section of Jiefang Road widen the reconstruction project
(G518 set line K150+
098.6-K162+729.3)
Publicity of social stability risk analysis information
↓↓↓
According to the "Interim Measures for Social Stability Risk Evaluation of the National Development and Reform Commission of major fixed asset investment projects" (notice on the issuance of major fixed asset investment projects on the issuance of major fixed asset investment projects for the Shandong Provincial Development and Reform Commission 》 (Lu Fahuang Investment [2014] No. 471) and other relevant regulations, Linyi City Highway Survey and Design Institute Co., Ltd. accepted commission to "expand the transformation of the western section of Jiefang Road (G518 Portal K150+098.6-K162+729.3) "Analysis of social stability risk, the relevant matters of the project are announced as follows:
1. Project overview
1
Construction unit
Linyi City Highway Business Development Center
2
Necessity of engineering construction
The completion of this project will improve the efficiency and traffic of existing roads, further improve the regional road network structure, build a large channel in the southern part of the urban area of Linyi City, effectively alleviate the traffic pressure of urban travel, improve the level of road services, expand urban development Space, strengthen the connection between Linyi City and the western urban area, and drive the economic and social development of the western part of Linyi City.
3
Engineering construction plan
(1) The route direction
From the route from the Liangshan District of Linyi City, the end point of the West Taoran Expressway Construction Project on the intersection of the G2 Beijing -Shanghai High Speed Cross, to widen the old road to the west. After passing the Beiqiao Village, a new one is set up at the West and G206 Weishan Line in the West. Continue to the end point of the route at Taoyuan Village, Wude Village, Lujiahu Village, Shanjiazhuang Village, and Shanjiazhuang Village, to the end of the line.
(2) Construction scale
The proposed project is 12.631 kilometers in length. The road base is 436.9 thousand cubic meters; road base drainage protection is 2132.3 hundred cubic meters; asphalt concrete pavement is 620.8 thousand square meters, small bridges 165 meters/9 seats, 15 culverts, 2 interchange interchange, 1 interchange, 4 channels, pedestrian, pedestrian travel Two flyover; permanent covers 106.9862 hectares.
(3) Design standard
The project adopts two -way six -lane -level first -level highway technical standards. Auxiliary roads and sidewalks are set up on both sides. The main line design speed is 80 km/h, and the auxiliary road design speed is 50 km/h.
4
Project land acquisition
The project is permanently covers an area of 106.9862 hectares, of which 56.6770 hectares are added.
5
Engineering period
The construction period is 18 months.
2. Overview of the type of social stability risk that may exist in the project
According to the actual situation of the proposed project, the legality, rationality, feasibility and controllability of the project construction implementation, combined with the construction plan, the social stability risk assessment unit intends to identify the social stability risk factors from the following aspects: 1. The legitimacy of the project 2. Reasonableness is questioned that the risks may bring; 2. The risks of land acquisition and demolition compensation of the project may bring; 3. Project construction affects the risks that may bring in the relocation, demolition and resettlement compensation of villagers; 4. Projects may be possible The risk of environmental impact; 5. The risk of impact on surrounding traffic on the project construction process.
3. Main matters to solicit public opinion
The purpose of the public opinion is to investigate the public's awareness and interests of the project in the influential area of the project. During the publicity period, the public can submit verbal, electronic or written opinions to our hospital by letter, email, telephone, etc., or directly to our hospital to reflect the opinions. Please indicate the real name and contact information of the public or appeal in order to feedback as needed.
1. Contact unit: Linyi City Highway Survey and Design Institute Co., Ltd.
2. Address: No. 29, Beijing Road, Beicheng New District, Lantong District, Linyi City
3. Contact: Zhang Gong
4. Tel: 0539-7308118
5. Postcode: 276037
6. Email: [email protected] (Please indicate the theme of email: the widen section of Jiefang Road is expanded and renovated project (G518 fixed line K150+098.6-K162+729.3) Social stability risk analysis public opinion and appeal)
Fourth, publicity cycle
Five working days have been announced since the announcement of this publicity.
The implementation of the project will
Construction of east and west channels in the south of Linyi City
Effectively alleviate traffic pressure for urban travel
Improve road service level
Source: Langya News Network WeChat Comprehensive
- END -
He Ruimao: It is not only the "small ability" of the law, but also the "good cadre" to get rid of poverty.
He Ruimao is not very old, but has rich work experience. He Ruimao originally work...
Puyang, Henan: A targeting leads the led to the promotion of the full coverage of the village (street) social workers' stations
As of June 28, 89 social workers' stations have been built in Puyang City, which h...