Weifang People's Hospital multiple measures to protect the masses for medical treatment

Author:Qilu.com Time:2022.06.30

Qilu.com · Lightning News, June 30th. On June 30, the News Office of the Weifang Municipal People's Government organized a press conference on the satisfaction of the public to see a doctor for medical treatment. At the press conference, the basic situation of the expansion project of the Weifang People's Hospital was introduced.

The reporter learned at the press conference that the first phase of the expansion project of the Weifang People's Hospital was recently planned. The new first -aid comprehensive building and the Academy of Sciences have a total construction area of ​​about 320,000 square meters, with 2,000 beds and 2,400 parking spaces. Among them, the emergency comprehensive building mainly undertakes the functions of emergency emergency treatment, medical technical examination, and inpatient ward to further optimize the service process and layout, and better serve the health of the masses. The Academy of Sciences mainly undertakes the functions of internal medicine hospitalization, medical technical diagnosis and treatment, etc. The purpose is to further solve the problems of the current internal medicine internal medicine internal medicine tension and insufficient development space for the medical technology diagnosis and treatment department to provide better medical treatment conditions for the masses. The second phase of the expansion project is a mid -to -long -term plan. The new college area is built in the south of Nanle Dao Street. The total construction area is about 200,000 square meters, the plank is 1,800 beds and 1,800 parking spaces. In the center, a specialized agglomeration is formed. After the completion of the first and second phases of the expansion project, more than 4,000 parking spaces will be added. At that time, after entering the hospital area, the vehicle can directly enter underground parking to achieve diversion of people and vehicles, alleviate the difficulty of seeking medical treatment for medical treatment and blocking the surrounding traffic.

At present, the first phase of the project will start construction in the near future, and more than 400 existing parking spaces will be squeezed after starting. In addition, the 500 temporary parking spaces on the construction of the first phase of the project will also be canceled. On the whole, parking spaces will be reduced by more than 900, which will affect the public to seek medical treatment to a certain extent.

In response to the above issues, the People's Hospital of Weifang City adheres to the people -centered development ideas, thinks that the masses think and are anxious, and strive to solve the problem of "urgency and worrying" for the masses to see a doctor, and use their hearts to protect the people's medical treatment.

Make full use of the second -phase expansion project land to build temporary parking lots. In order to ensure that the public parking was not affected after the start of the first phase of the expansion project, the hospital planned in advance and deployed it early to build a temporary parking lot on the construction land of the south -phase project of Nanle Dao Street. It is expected that more than 1,200 parking spaces are expected. Under the premise of complying with relevant regulations, try to shorten the construction time of the temporary parking lot, and strive to put it into use before the first phase of the expansion project. At the same time, a free ferry car is added. Flowing operations and circulating operations are convenient for the masses to park, but also save time to see a doctor, and effectively bring convenience to the masses.

Multiple measures to strengthen parking management in the courtyard. Continuously optimize the traffic flow lines in the hospital, design and update road reminder signs to facilitate patients to understand their location and travel routes, shorten parking time, and improve parking efficiency. Accelerate the transformation of smart parking and improve parking management capabilities and parking space. Pay attention to strengthening cooperation with the Big Data Bureau, improve the construction of the hospital parking lot management system and traffic guidance system, improve the utilization of parking spaces, maximize the use of existing parking space resources to reduce the time for the people to see a doctor for medical treatment.

Lightning News reporter Zhou Mingxiu Correspondent Li Lin Weifang Report

- END -

Jinyang Lake -Ru Mengji City Shengyi opened

(Shanxi Pictorial Jinyuan News) On June 24th, it was learned from Jinyuan District...

Zhenkang County Meteorological Bureau to lift the rain and blue warning [Class IV/General]

The Zhenkang County Meteorological Bureau was lifted at 01:18 of 2022 at 01.18 seconds of 02 seconds 2022, 11:21:15 on June 08, and a blue warning released by 11:11:50.