Nyingchi Water Resources Bureau promotes improvement style and has a hard work.
Author:Main News in Tibet Time:2022.06.30
Since the further improvement of the work and implementation of the work style, this website Bayi Electric (Reporter Hu Wen Wangshan) has attached great importance to the implementation of the work and the implementation of the work. Actively crack the difficulties and block points, and promote the improvement of the improvement of the work style.
In -depth investigations and research, cracking the planning "Talk on Paper". The "Fourteenth Five -Year Plan" Water Security Guarantee Plan for Nyingchi has been agreed by the municipal government. The plan involves 4 categories of 10 sub -items, a total of 53 projects. During the "Fourteenth Five -Year Plan" period, the total planned investment was 2.313 billion yuan. The Municipal Water Conservancy Bureau does not have in -depth local surveys, the investigation and demonstration of the investigation, the planning and design of the plan, and the inconsistency of the planning and design are not in line with the actual situation. The heavy weight, make good use of various preferential policies, find the project and do practical planning. Recently, two working groups are sent to each county (district) to conduct investigations, comprehensively grasp the basic situation of the project point, and fully demonstrate the project construction of the project construction. The necessity and feasibility, avoiding the problems that do not match the actual situation in the future with the actual situation.
Actively communicate and coordinate to crack the "far away" in the approval. There are many Nagasu Nature Reserve, and the planned land is tight. The Life Bureau of the Water Resources Bureau of Nyingchi actively acts, actively coordinated, compressed the project approval time, and actively strengthens the development of the project. Communication and connection, timely submit various approval materials to various units, and clarify that the leaders of a bureau contacted a county (district) to help solve the difficulties encountered in the process of applying for the preliminary approval process, formulate the completion time limit table, and require The "Fourteenth Five -Year Plan" planned livelihood water conservancy project completed the preliminary approval by the end of 2022.
Strengthen supervision and management to crack the "duckweed in water" in construction. After the issuance of the project funds for the project, the project legal person's establishment, the long bidding time, the delayed project, and the funds lying accounts were promptly issued in a timely manner. Time, compressed from 3-4 months before to the current 1 month, to ensure the connection between the water system of the Milin County and the construction of Shuimei Rural, the Mo Pu Township in Bomi County, Mo Ruhe, and the Mu Long Township of Li Long Township, Milin County. A large number of people's livelihood water conservancy projects, such as the safety of rural drinking water, started construction as scheduled, and completed an annual investment of more than 322 million yuan.
Actively and improve the mechanism to crack the "mirror flower water moon" in use. The Water Conservancy Bureau of Nyingchi City, in response to heavy construction, light management, especially after the completion of individual rural drinking water projects, management cannot keep up with the problem of "seeing and not eating water", and conscientiously implement the "Water Supply Project of the Agricultural and Pastment Zone in the Tibet Autonomous Region". "Administrative Measures" further improved the management and protection mechanism of rural water supply projects, and comprehensively implemented the "three systems" and "three responsibilities". The city hired a total of 1,764 rural management water staff to realize that the villages and villages had water management staff, clarifying the responsibilities of water management, the responsibility of compacting the water staff, and ensuring that they were famous and effective. At the same time, the inspection of water quality is increased, and the water quality inspection coverage rate of rural water supply projects in the city is 100%and the qualified rate is 100%. Basically, the people of all ethnic groups have changed from "drinking water" to "drinking good water". Continue to increase the maintenance and maintenance of rural water supply projects, this year will continue to consolidate the safety of drinking water for 6,000 people.
- END -
Tianjin Nankai Market Supervision Bureau fully guarantee food safety of the Twelfth Party Congress of the City
China Food Safety Network (Wang Jinchun reporter Li Tian) The Twelfth Congress of ...
Our city fully improves the urban environment welcoming event
Arts Avenue, Youyi Road and other roads strengthening flowers planting, frequent inspections on municipal facilities and municipal facilities, and the increase in mechanized and dust -free operations