Article 3: Crossing the Taklama Ganan Desert Highway
Author:Tianshan.com Time:2022.06.30
On June 30th, Line S254 was operated by the Captain Ping to the end of the road. This is the third road that crosses the Taklama Ganan Desert.The total length of the road is about 334 kilometers, of which about 307 kilometers of the desert road section is an important part of the "6 horizontal and 6 vertical" highway network planned by Xinjiang's "13th Five -Year Plan" plan.The driving distance from the completion of the road to the city to the city to the city of Korla was shortened by 350 kilometers, and the driving time was shortened from the original 12 hours to 6 hours.(Reporter 暴 storm)
- END -
[When the city is created] Civilization is said on the order of the zebra crossing under the traffic light
Everyone strives for the cityCivilization you and I passPayment of order under tra...
A full father loves Turpan Dad to build a swimming pool for his 8 -year -old son with a carriage
June 15, Turpan, XinjiangMr. Hu spreads plastic cloth in the carriage and filled w...