Is there a discount on the fare of Kunming Metro Line 5?Do you support your face?Look at → -

Author:Open screen news Time:2022.06.29

Kunming Rail Transit Line 5 will depart from the Expo Park Station at 11:00 today (June 29) to open the initial operation.

Take the time, site, fare, transfer ... The officials concerned by these citizens have answered the officials, and let's take a look.

Question 1 Metro Line 5 is about how long it takes for one way to reach the terminal from the starting station?

Answer: Line 5 runs for 16 hours and 35 minutes. Among them, the direction of Baofeng Station is 6: 20-20-22:20 in the morning. : 55. The one -way running time is 49 minutes, and the entire line is equipped with 26 charged trains. The minimum interval of the peak period is 6 minutes. With the initial operation of Line 5, the mileage of Kunming rail transit operations reached 165.85 kilometers, and 103 stations (among which 10 were transferred).

Question 2 Metro Line 5 runs through many tourist attractions. Are there some tourist sites recommended?

Answer: Kunming Metro Line 5 passes through the World Expo Park, Kunming Zoo, Anti -Japanese War Memorial Hall, Cuhu Lake Park, Maitreya Temple Park, Yunnan Ethnic Village, Caohai Ecological Corridor, Haiyu Dam, Dianchi Scenic Area, Haidong Wetland Park, etc. Tourist attractions show the line characteristics of "Kunming ecological livability, harmonious symbiosis of nature and nature". The majority of passengers can take a trip to Line 5 and talk about walking.

Question 3 For the need for tourism, what kind of humanized measures do the subway station provide tourists?

Answer: Kunming Metro Line 5 has a total of 20 maternal and infant rooms to provide private breastfeeding places to mothers, so that mothers who take the baby to the subway are worry -free. If you take a wheelchair, push a stroller, or carry a large amount of luggage and take the subway, you can go to the Customer Service Center to help enter and exit from a barrier -free elevator. In addition, the platform with a "barrier -free waiting car" logo is lined up at the waiting car. The platform corresponding to the platform is equipped with a parking chair, a stalemate and a large luggage to facilitate your safe ride.

Question 4 Can you introduce the fare of Metro Line 5? Do you have to launch any preferential policies?

Answer: The fare of Kunming Metro Line 5 is implemented in accordance with the Kunming City Transportation Bureau, the Kunming Development and Reform Commission's "Approval on the Official Pricing of the Kunming Land Railway Network Fare" (Kunjiao Lianfa [2021] No. 54), implement mileage mileage The pricing system starts at 2 yuan within 0 to 4 kilometers. After that, the actual mileage will be "handed away and decreases". Both are increased by 1 yuan, and so on, the current online fare is 2 yuan to 8 yuan.

At present, it is preparing to issue electronic ride -to -vehicle equity products and carry out cumulative preferential activities. In the future, the rights and interests of electronic ride -vehicle ride -by -vehicle ride -by -vehicle vehicle bonds, equity funds, and equity coupons will be launched in the future.

Kunming Metro will also continue to cooperate with Alipay, Yunnan UnionPay, Construction Bank and Tencent, to carry out preferential ride activities for the Kunming Metro Internet users to benefit more passengers for the preferential ride benefits of green subway travel.

Question 5 There are two transfer stations on the entire Metro Line 5. How to transfer?

Answer: Line 5 is transferred at North Railway Station, Line 4, Line 2 and 2. The north station of the train adopts the transfer method with Line 4 on the same platform, and the negative three -story platform is driven to the direction of Jinchuan Road. Kunming South Railway Station transfer to Line 5 to the direction of the Expo Park. Metro Line 2 transfers through transfer channels and Metro Line 4 and Line 5.

Wuyi Road Station is the transfer site of Metro Line 3 and Metro Line 5. After the opening of Line 5, three entrances of D, E and F were added to the existing basis. Two lines are connected through the transfers of the station, and passengers can transfer through the channel layer according to the guidelines.

Question 6 Metro Line 5 supports "brushing face"?

Answer: Please note that the transformation of the "brushing face" system on Metro Line 5 is actively promoted. If passengers pass the gate on Line 1, 2, 3, 4, and 6 The line station can use the "Kunming Metro APP" or "China Construction Bank APP" to scan the code through the car code.


Spring City Evening News-Kaiping Journalist Zhang Yong

- END -

Two towns: pilot first high -quality promotion of agricultural land recycling work

Agricultural land film is the fourth largest agricultural capital after seeds, fer...

Xin'an County Meteorological Bureau issued a high -temperature orange warning [level II/severe]

Xin'an County Meteorological Observatory issued a high -temperature orange warning signal at 9:30 on June 8, 2022: It is expected that the highest temperature in all towns and towns in our county will...