Maintenance of Wulan Mulun River Bridge 3!Go like this →
Author:Yijin Hollow Banner Railway Me Time:2022.06.10
Announcement of semi -closed roads on the road of Wulan Mulun River No. 3
According to municipal work requirements, it is scheduled to be from June 9th to June 14th, 2022, every timeFrom 9:00 am to 16:00 pm, the Ulan Mulun River No. 3 Bridge will be maintained. During this period, the bridge surface will be semi -closed.
Maintenance points 2 steps, as follows:
1, June 9 to June 11, 2022, closed from the three lanes of the Ikin Hollow Banner to Kangbashi.At the same time, the three lanes from Kangbashi to Ikinholo Banner temporarily changed to two -way lane.
2. June 12 to June 14, 2022, closed from the three lanes of the Kangbash to Ikinhollo Banner, and at the same time, the Ikinhlo flag was located to the threeThe lane is temporarily changed to two -way lane.
During the closed period of maintenance of the bridge deck
Please plan the driving route in advance
Avoid congestion
- END -
Linwu County Meteorological Bureau issued a heavy rain orange warning [Class II/serious]
Linwu County Meteorological Station upgraded the rainstorm warning signal at 13:39 on June 10, 2022: Orange: In the past 1 hour, the rainfall of towns and villages in Nanqiang Town, south of Linwu Cou
At 3:30 pm, a press conference on the joint control mechanism of the State Council, the live broadcast entrance was opened →
Healthy China data-desc = will be broadcast live on June 24th at 15:30 data-intro ...