The Baihetan Hydropower Station ushered in the first batch of units for production and power generation
Author:Xinhuanet Time:2022.06.28
A scene of the Baihetan Hydropower Station taken on June 28.
On June 28, the Baihetan Hydropower Station ushered in the first batch of units for production and power generation.The Baihetan Hydropower Station is located on the Jinsha River dry flow section at the junction of Ningnan County and Qiajia County, Sichuan Province. It is a major national project that implements the "West Power East" with a total installed capacity of 16 million kilowatts.
Xinhua News Agency reporter Cao Mengyao Photo
- END -
The male teacher was accused of harassing a 11 -year -old boy.School response: Fleerated
recentlyA video of One Male Teacher about 11 years oldSpread on the InternetIntern...
"Festival" "can" "can" open carbon reduction "good recipes" for school -enterprise
In the summer, the temperature of the air conditioner can save 7%of the power savi...