In the heavy rain, they stick to the front line of flood prevention

Author:Civilized Qingdao Time:2022.06.28

Affected by the strong flow of weather, Qingdao dropped rain in the afternoon of June 26. There were stagnant water in many sections, which brought hidden dangers to road traffic safety. Rain love is the command. All departments of Qingdao responded quickly and dispatched in time, and insisted on the front line of flood prevention.

The bus emergency team members set up a warning sign at the accumulated water site.

400 flood control teams fight the front line

Qingdao Water Drainage Company deployed in advance and strictly implemented various flood prevention responsibilities, and launched a level of flood prevention level response at 1:25 pm on the 26th, organizing 7 flood prevention and rescue teams of 400 people to inspect and drain the road to ensure the safety and smoothness of the road.

The staff of Qingdao Water Drainage Company opened the rainwater dumplings to quickly drain. Photo by Wu Shuai

At 16:30, the rainy urban area gradually increased. Drainage companies organized drainage personnel to conduct uninterrupted inspections on key roads such as Hong Kong Road and Shandong Road. Arrange a special person on duty. As of 10 pm on the 26th, the average rainfall of the urban area exceeded 100 mm. In the meantime, Mengzhuang Road Railway Cave, Zhenping Road Railway Cave, Ruijin Road Railway Bridge Cave, Zunyi Road Railway Bridge Cave, Cang'an Road Jiao Erqiao Cave, and Coastal Road Railway Cave were affected by heavy rainfall. With the weakening of the rain, some bridge cave water exclusion gradually resumed traffic.

More than 2,000 traffic police escort traffic

Qingdao Traffic Police launched a plan for emergency response to severe weather, dispatched more than 2,000 police forces, increased patrols, discovered and mastered the situation of the road in time, commanded the vehicle safety through the wading section, rescued the trapped vehicles and personnel, and timely dispose of various police conditions to ensure the roads to ensure the road Safe and unblocked.

Traffic police Wei Xiaoyong used police cars to rescue injured children in the rain.

The traffic command center formulates the video inspection screen investment scheme and video round tour plan in advance. In real time, the road conditions are focused on changes in road conditions. The traffic guarantee work of the main roads and bridges has been strengthened, while the traffic police departments of various districts and municipalities have patrolled control and control of multiple segments of traffic accidents along the national highway, village entrances and exits. And pay attention to the alarm situation in real time through video inspections, 122 police receptions, etc., and alerts such as traffic accidents and vehicle failures during the rainfall. A series of measures such as trailers and timely release of road conditions will be reduced to maximize the adverse effects on roads.

More than 3,200 flood control emergency personnel are all on the job

The Municipal Urban Authority should do a good job of protective measures such as the first seawater bath, sinking square, and other key parts of the first seawater bath, organize the inspections of hidden dangers in various industries, eliminate hidden dangers, and prepare emergency supplies. The city's 115 flood prevention emergency teams and more than 3,200 flood prevention emergency personnel in the fields of gas, heating, sanitation, and city -capacity landscapes were on their jobs to do their best to deal with flood control emergency treatment. Strictly implement the 24 -hour duty and leadership system, and discover the rapid response and proper disposal of danger, minimize disaster losses.

The staff of the sanitation system cleans the road area water in the rain.

128 subway stations are operated normally

As of 9 pm on the 26th, 128 stations of 6 lines of the 6th line of the city's subway operation line were operated normally. Qingdao Metro Operation Company launched a first -level response to stack the flood control sand bags and flood prevention baffles such as vehicle sections and stations in advance, and build a water prevention fence to prepare for flood prevention. Among them, 30 emergency teams were formed, equipped with more than 140,000 bags of sandbags, 585 water pumps, and 38 emergency pumps. Some stations also prepared emergency umbrellas for passengers without rain.

Seize the "first time" to prevent geological disasters

In order to do a good job in the prevention of geological disasters under heavy rainfall, the Municipal Natural Resources and Planning Bureau seized the "first time". Strengthen supervision and monitoring, do a good job of information communication and sharing with the meteorological department, and judge the flood prevention situation at any time; organize a strong expert team to provide technical support in a timely manner. Start the group testing to control the initiative of preventing emergency. Since the afternoon of June 26, the natural and resource departments of the municipal, district (cities) have arranged a person to conduct a rainpain area of ​​important geological disaster prevention areas such as the collapse control point of No. 23 Dalian Road in Shibei District.

- END -

Fengtai County Meteorological Bureau issued a thunderbolt yellow warning [III class/heavier]

At 13:04 on June 10, 2022, the Fengtai County Meteorological Observatory issued a lightning yellow warning signal.Lei Chong, Fengtai County, and Chengguan may occur in southern towns and towns in the

Safety ball recruit rural operation experienceists!Experts at home and abroad provide suggestions and suggestions to avoid rural tourism "Qiancun"

On June 30, Lin'an's Tianmu Village brand promotion and the Yangtze River Delta Ru...