Yinshan Town, Dongping County: Equipped by danger to build a "safe embankment"
Author:Dongping County Rong Media Cen Time:2022.06.28
Affected by the autumn flood last year, the Yellow River Dongping Yinshan section was in a high traffic running state for several days, which caused a lot of pressure on the Yellow River embankment and guidance projects in the section of the Yellow River, and even repeatedly dangerous.
The interests of the masses are higher than everything. In response to the exposure of flood prevention in the Yellow River in the past, this year, Yinshan Town, Dongping County adheres to the concept of the people's lives first, and take the initiative to implement the ecological protection and high -quality development strategy of the Yellow River Basin, and actively strive for the Yellow River River affairs department. Agree, implement the Yellow River control and production dyke and the stasis removal reinforcement project, and build a stable defense line along the property of the Huang people.
"The original Yellow River control project and production dyke construction time of Yinshan Town was earlier. After the flood control stone was stacked on the embankment surface, it could only accommodate a vehicle traffic, which increased a lot of pressure to the Yellow River flood prevention and rescue. Reinforcement project. "Ma Xin, deputy secretary of the Party Committee of Yinshan Town.
If you say it, do it if you do it. Yinshan Town establishes the headquarters of the insurance reinforcement project, and the main leaders of the town serve as the team leader, and the relevant departments are transferred to the headquarters to enrich the headquarters. At the same time, the cooperation of departments such as the Yellow River, Public Security, Water Politics, Power Supply, and Communication, and officially implemented the Yellow River Town Yellow River control and production dyke reinforcement project after the Yellow River controlling and production embankment at the end of May. 11 villages are involved along the line, and tree plants, poles, houses, etc. need to be cleaned up. It is a true portrayal of this project.
"Within the scope of the project, in addition to the town land, it also involves a 'flying land' and trees in Taiqian County, Henan Province. The communication and coordination are very complicated." Ma Xin, deputy secretary of the Party Committee of Yinshan Town.
At that time, due to the needs of the epidemic, Henan and Shandong were inconvenient, but the implementation of the project was urgent. In order to determine the details of land acquisition and tree plant compensation as soon as possible, in addition to actively contacting the other party's township staff, the staff of Yinshan Town also adopted the method of video connection, which involved land and above -ground attached to the other party. Compensation work has been promoted smoothly. As of now, Yinshan Town has cleaned more than 26,000 trees and more than 60 poles, and has moved more than 40 graves. 9 small gaps and circular pipes have been treated. More than 10 houses.
With the completion of the clearance work, the project construction has entered a substantial stage, but it has also ushered in a new problem. During the project construction process, the float -type riverside pipes that originally floated on the Yellow River surface were difficult to work normally in the turbulent water flow due to the large flow of the Yellow River and the shape structure of the float cylinder, which caused the relevant work to be in a state of pause. How to do? How to deal with it? The members of the headquarters held a meeting several times to ask the experienced engineers. In the end, after thinking about it, a new path was found. That is to use the sealing boat relay to carry the river pipeline to perform operations. The turbulent water flow can be passed through the gap between the sealing boat, which is greatly enhanced, ensuring the smooth operation of the project.
"At present, the entire project is promoting in an orderly manner. After the implementation of the project, it will greatly alleviate the flood control pressure along the Yellow River in Yinshan Town, effectively eliminate hidden dangers of flood prevention and safety, and improve the traffic control capabilities of flood control, transportation vehicles, rescue equipment, and material transportation. The security of the Huang people's lives and property was built in the area of the jurisdiction. (Correspondent: Niu Mingjie)
- END -
This bus driver is not ordinary, and it can be "soaring English" in 12 years without violations of regulations
Take a bus to zhongshan Park? The car went to Xinhua Road to pick up the water tow...
There are large governances hidden in the small incision -Chelk Qi Township creates contradictions and disputes to resolve the "terminal"
In order to unblock the channels for the interests of the masses and promote socia...