[Central Media see Gansu] Zhonglan Railway (Gansu section) interval high -voltage penetration of cables to send electricity work to be fully launched

Author:Gansu released Time:2022.06.28

At 2:14 am on June 24th, as the intercom came from the intercom: "The first level of the Huangmaogou Division is connected, the comprehensive penetration has been incorporated, the equipment is operating normally, and the power is over." The Zhong (Wei) Lan (Prefecture) Railway (Gansu section) North Beach distribution center to the Huangmaogou partition area 10KV high -voltage first -class penetration, comprehensive penetration of the power delivery success, marked the high voltage of the Zhonglan Railway (Gansu section) interval high voltage The work of running the cable is fully developed.

In order to ensure the success of the power delivery once, the Zhonglan Project Department planned in advance, carefully compiled the power delivery scheme, optimized the allocation of resource allocation, and organized personnel to inspect the interval equipment and line status multiple times before delivery. In the simultaneous groups, three groups of operations, two people in each group, one person operate, one person monitor, and one group of emergency groups, prepare to deal with various emergencies at any time. The entire power delivery process is carried out strictly in accord Power supply section personnel participate in the whole process.

This time, the 10KV of 10KV was successfully delivered by the cable, which laid a solid foundation for the professional equipment of the Zhonglan Railway (Gansu section) to communicate, signal, information and other related units and other related units. In the next step, the Zhonglan Project Department will strictly implement the relevant work of duty and equipment inspections, actively promote the construction progress to ensure that the Zhonglan Railway is opened as scheduled.

Source: Economic Daily News Client

Edit: Xu Minzhi Editor: Zhu Wang School Review: Wang Xuexiang

- END -

Multiple new stations and new lines are opened.

Starting at 00:00 on the 20th, a new train running map is implemented by the natio...

Stable employment, help rural revitalization

On June 28, 2022, the CPPCC Office of the Mingshan District CPPCC, the District Pa...