22,000 parking spaces are opened in Karamay to open the "Life Channel"
Author:Tianshan.com Time:2022.06.27
Tianshan.com reporter Guo Ling
The Karamay River, which passed through the city, winds down from the Kowloon Pond, and the colorful lights in the river water are like a ribbon, embellished in the night. In the evening, there are endless streams of citizens and tourists who drive to the river. The roads on both sides of the road are full of cars and often occupy fire protection channels. In order to solve this problem, the three -dimensional parking garage is being built nearby.
On June 26, the reporter came to the Hanbo Central Plaza by the Karamay River to see the four -layer three -layer parking garage under construction. It has entered the end of the project and was put in mid -July. "This project was opened in September 2019. After completion, 307 vehicles can be stopped, which can effectively alleviate the difficulty of parking in this area." Said Tang Guojun, the person in charge of the project of the Tenth Construction Group Co., Ltd. of Shaanxi.
It is understood that Karamay is building two three -dimensional parking lots, which are added more than 800 parking spaces in the west side of Hanbo Central Square and Kangcheng Garden Ruyiyuan Community. In recent years, the Fire rescue detachment of Clarimi City has jointly launched the "Life Channel" and solving parking problems with the local district governments and relevant departments. As of now, the city has added 22,000 parking spaces.
Fire rescue workers are measured the width of the driving lane and not less than 4 meters. Photo by correspondent Wang Fengfei
The detachment has formulated the "Implementation Plan for the Central Governance Action for Life Channel" to open the "Life Channel", clarify the division of responsibilities, scope of governance, rectification measures and work requirements of relevant units, and promote the update and transformation of the fire facilities of 18 old residential communities in each district The expansion and maintenance of the fire lane and parking lot is included in the urban planning.
On the 26th, in the North Community of Shengli Road Street, Karamay, Karamay, the staff was applying the labeling line on the roadside parking space. "The residential areas of our jurisdiction are relatively concentrated. In the past, the fire passage was often blocked due to difficulty in parking." Lan Xinrong, secretary of the North Community, introduced that through road expansion and other methods, they successively added 145 parking spaces.
"Our community was built early, and there was no planning parking space at that time. Now, after the road surface inside and outside the community is widened, parking spaces are also planned without affecting the normal traffic of the vehicle. Essence
The Fire Rescue Detachment of Clarmai City can use the fire truck to test whether the fire channel can be connected normally. Photo by correspondent Wang Fengfei
Caramay uses informationization and big data methods to include illegal acts of "occupying and blocking fire channels" into the citizen integrity system, and in accordance with the relevant provisions of the "Caramari City Nature and Social Legal Personal Council Trusting Measures (Trial)" to conduct dishonesty punishment.
In addition, Karama's Fire Rescue Detachment, in conjunction with the public security and traffic police departments, formulated the "Notice on Establishing a Joint Law Enforcement Mechanism for Investigation and Tortor Channel", and issued the process of optimizing the process of occupying the fire truck channel, and dialing "the property company and the masses" 96119 "reported complaints, the detachment accepted the feedback to the traffic police department, and the traffic police department sent a reminder reminder SMS. The property company checked and locked the car, educated drivers and unlocked the process after 15 minutes.
It is reported that this method has been included in the "Guidelines for the Comprehensive Governance of Life" of the Fire Fighting "Life Channel" for the Fire Rescue Bureau of the Emergency Management Department for reference.
"In order to solve the long -term planning of parking problems, we coordinate relevant departments to establish mechanisms such as elastic parking, opening, tidal parking, sharing parking, etc. to fundamentally solve the problem of the mass parking difficulties." It is said that in 3 years, 11 new public parking lots, more than 10,000 parking spaces were built, 65 electric bicycle parking lots, 67 charging piles, and 670 charging ports were built.
- END -
Sichuan opera enters 10 schools in the campus to join the "Facebook China · Opera Wanli" operation
Original short video: The "sweet online love" you think is actually fraud
As the rhythm of life is increasingly acceleratedMore and more single men and w...