Gao Mi encountered heavy rainfall and immediately launched a flood prevention emergency response
Author:Qilu.com Time:2022.06.27
Qilu.com · Lightning News June 27th. Affected by the warm and humidity flow and cold air flow of the auxiliary high edge, Shandong Gaomi ushered in the first large -scale rainstorm since the afternoon of the 26th. Cadres quickly sank in the first -tier to invest in rescue and rescue.
From 13 pm on the 26th, Shandong Gao Secret has ushered in the first time since the flood in the flood. The rainfall reaches the peak at around 15:00, and the rainfall of only 14:00 to 15 o'clock has reached 75.6 mm, which is a whole than local June. The monthly rainfall is still more.
The heavy rainfall range, large rainfall, long time and lightning and heavy winds, the maximum wind reached 11. As of 9 am on the 27th, the average precipitation of Gaomi City was 171.3 mm, and the maximum precipitation reached 287.5 mm. The heavy rainfall also led to the serious accumulation of water in some sections of Gaomi urban areas. The shops in the shops and car broke down. To this end, Gaomi City immediately launched the emergency response of flood prevention. Increase police forces at the sections of Yishui and intersections, strengthen command and guidance, alert disruits, rescue and rescue, and prevent traffic congestion and accident risk. In accordance with the division of labor and emergency plans of the town districts and relevant functional departments, each town district and relevant functional departments quickly organized the majority of party members and cadres and emergency rescue rescue teams to sink the line, and made every effort to make rescue and rescue work such as hidden danger investigation, water accumulation exclusion and mass transfer.
Zhang Qichang, a flood control staff member of the Housing and Construction Bureau of Gaomi City, told reporters that all the staff are now on duty at the post for 24 hours, paying close attention to the rain, and the road patrol staff cleans up and dredge the water outlets in time, and set a warning mark on the road section with deeper stagnant water. Pay attention to avoiding vehicles to ensure safety.
At the South Street section of the high secret railway station station with severe stagnation, Zou Xilong, a high -secret flood control staff, led his colleagues to rush into the water at a critical moment and opened the water dumplings one by one. Due to the high depth of the water, the middle finger was squeezed, and his teeth insisted on completing the task. It was not until most of the water accumulation was excluded before going to the hospital for treatment.
Zou Xilong, a flood prevention staff member of the Housing and Construction Bureau of Gaomi City, said that at a critical moment, party members and cadres must charge ahead. Personal pain is not as safe as the safety of the people's property.
Affected by thunderbolt, a number of 10 kV power supply lines such as Gaomi Century Line had a quick trip, resulting in 360 transformations and 231 public suspension, and more than 10,000 residents' electricity was affected. After the accident, the power supply company quickly launched an emergency response and made every effort to do a good job in the emergency response work in extreme weather. 14 repairs such as the Urban Power Supply Center, the Baicheng Institute, the Gaojia Gao Mi Branch, and the Guangming Branch were satisfied. After inspecting the repair conditions, he immediately rushed to the scene to surge in the rain.
After the hard work of the power supply department, the current damaged lines and specialties have been restored to power supply. The meteorological department reminded that the heavy rainfall will continue today, and high and dense entering the state of flood prevention emergency, and departments at all levels are waiting to adhere to the front line of flood prevention and rescue, and strive to ensure the safety of the lives and property of the people.
Lightning News reporter Liu Bei Gaolong Media Center Hujiang Lin Xingcheng Weifang reported
- END -
"Safety anchor is here again" Enterprises in the Emergency Administration organized the "Consultation Day" activity dispatch meeting of the "Consultation Day" of Safety Production
In order to do a good job of the Consultation Day of the 21st Safety Production Mo...
The Gaizhou Meteorological Bureau issued a hail orange warning [Class II/serious]
Hail orange warning signal: It is expected that in the next 6 hours, hail weather will appear in the waters of Gaizhou and the northern part of the Bohai Sea. At the same time, it may be accompanied b