To reduce the burden of enterprises, the Housing and Urban Construction Bureau of Luohe City helps the efficiency of approval and improves

Author:Dahe News Luohe News Time:2022.06.26

Dahe Daily · Yu Video Reporter Liu Guangchao Correspondent Chen Yajing Luan Wenqi

In order to rapidly promote the construction of engineering projects, the Fire Protection and Acceptance Service Center of Luohe City Construction Engineering uses the masses as the starting point. In order to solve the problems of repeated submission, low efficiency, and slow transfer of approval paper drawings, digital drawings need to be implemented for the construction drawings required for the application for fire design review. The review, at the same time, optimize the government service model, greatly shorten the time limit for anti -defense design review, and improve the efficiency of fire approval.

Say goodbye to paper drawings to reduce the burden of corporate corporate

"Adopt digital drawing reports, no need to run back and forth with paper drawings to reduce the burden on the enterprise in the early approval session." Said the person in charge of the Municipal Construction Engineering Fire Acceptance Service Center. Earlier, the enterprise needs to apply for the fire design review and approval procedures with paper drawings. The applicant needs to provide hundreds of design drawings. Printing and preparing to apply for the application information will take a lot of time. Once you are wrong, you must return to the modification. This is complicated. The link not only wastes resources, but also reduces the efficiency of approval. After the implementation of the digital newspaper, the enterprise can save a lot of drawing costs, and it is more convenient to do things. The masses handle the fire design review business "at most one run."

Do not leave home, handle online

For other construction projects that need to issue fire certificates to apply for a construction permit, implement online paperless and zero -window processing. Enterprises can directly submit digital drawing applications in the fire examination system to apply for business. After the system is accepted, the reviewer can issue a certificate to the enterprise, which effectively solves the problems such as "time -consuming", "difficulty", and "running back and forth".

Involve in advance, optimize the service

For special construction projects for fire design review, convenient forms such as "online pre -review" and "steward service" are adopted. After completing the construction map review on the joint review system of the digital construction drawing system of Luohe City, the project Directly obtain electronic drawings to conduct online pre -trial on the project, and at the same time determine the service commissioner according to the needs of the construction unit, and provide services such as the "steward -type" full -process policy consultation, technical guidance, and information inquiry. For the project approved by the pre -examination, the enterprise can directly enter the approval process.

This has effectively created a government environment with "less approval matters, high efficiency, and excellent service quality". Next, the municipal construction engineering fire acceptance service center will continue to deploy around the Municipal Housing and Construction Bureau's "Capable Style Construction Year" activity to serve services to serve services for services The city's economic development and project construction escort.

- END -

Yumen Science and Technology Bureau and the Association for Science and Technology to thoroughly study and implement the spirit of the 14th Provincial Party Congress

Implement the spirit of the meeting to lead the pioneer——An Yumen Science and Te...

Suzhou Meteorological Bureau to lift the wind blue warning [IV level/general]

Suzhou Meteorological Observatory, June 09, 2022 at 08.47, lifted the wind blue warning signal.