The flood prevention project of Yixiang Bridge in Jinquan Road, Linyi realizes the main line of trial opening
Author:Langya News Network Time:2022.06.25
On June 22, 2022, the flood prevention project of Yixiang Bridge in Jinquan Mountain Road was opened to traffic, and the east and west directions of the Yihe Bridge were fully released, which greatly alleviated the pressure of citizens' travel.
According to the rectification requirements of the flood control, the base section of the Nanzuan Road is transformed into a bridge according to the rectification requirements of flood control.Essence
Since the project entered the venue on March 15, 2022, in order to restore transportation as soon as possible, after more than 100 days of struggle, participating in the construction party overcame the difficulty of material transportation under the prevention and control of the epidemic, and the difficulties of personnel tensions.Construction forces, work overtime to catch up.Up to now, the main line of Yixiangqiao has been opened to traffic, and the remaining from west to south, from north to east ramps are accelerating construction. It is planned to complete all construction tasks in mid -July to achieve the east interaction of Jinquan Mountain Road.
Source: Linyi City
- END -
Wuhan released the city's flood prevention and drainage status to report the cumulative maximum rainfall of 107.8 mm
Hubei Daily News (Reporter Huang Lei, correspondent Li Peng, Zhang Ke) At 8 am on ...
Hubei Xiaogan Grand Theater premiered on June 28
Jimu Journalist Chen YongOn June 28, the large -scale bell and the National Orches...