latest progress!Chengdu will add a hospital

Author:Published by Chengdu Time:2022.06.25

Covering an area of ​​about 106.59 acres

Configure 650 beds

Native

The latest progress of Xinjin District People's Hospital is here

Xinjin District People's Hospital (including supporting facilities)

Since the start of construction, it has attracted much attention

So where is the hospital? What do you look like?

What are the high -tech?

Take a look

Covering an area of ​​about 106.59 acres

Xinjin District People's Hospital

(Including supporting facilities) projects

Located in the five groups of Yingxian Village, Baodun Town

Xianhe Village Ten and Eleven Groups

Covering an area of ​​about 106.59 acres

Total construction area of ​​project planning

About 129902.57 square meters

650 beds for preparing beds

The main construction content includes people's hospitals, disease control centers

First aid center, law enforcement brigade and two supporting road projects

BIM Technology Smart Construction

The construction of the new hospital adopts BIM technology to focus on construction

Difficulty parts realize visualization

Enable engineering managers to foresee issues in advance

Response in time

Effectively avoid errors that may occur during the construction stage

Save the cost and time of engineering due to increasing rework

Greatly improved engineering efficiency

besides

The project also adopts the three -dimensional modeling of drone aviation test tilt

Calculate earthwork

Perform the excavation analysis and operation of earth and stones intuitively and effectively

To achieve the precision and refinement of earthwork balance calculation

It has a positive effect on project cost control

at the same time

For Chengdu Xinjin District People's Hospital (including supporting facilities)

The surrounding buildings are dense and there are many residents

Smart dust monitoring facilities are adopted at the construction site

Automatically spray dust reduction to over -the -standard areas

There is also a noise real -time monitoring system on the spot

Once the noise exceeds the standard, a noise reduction warning is issued

Remind the management staff to take timely measures

Currently

97% of earthwork and foundation pit support series projects

Anti -floating anchor rod completes 35%

Basic pit inspection and tower crane basic installation work has been completed

Waterproof and basic engineering construction is fully developed

Comprehensive Chengdu Xinjin, Red Star News

Chengdu Published Edit | Meng Niang

- END -

From 0:00 on June 19th to 17:00, a new local infection was added in Beijing to screen for the society.

On the afternoon of June 19, the Beijing Municipal Government News Office organize...

Paeonia flowers are picturesque, agricultural and tourism integration promotes revitalization | Pin County New Farmers "Forex" "Flower Career"

The best year is good, and peony flowers are drunk. In June, in Tou Road Village, ...