new progress!Chengdu Unicorn Island Park three batches and one -standard section of the main structure of the main structure of the ground
Author:Love to see headlines Time:2022.06.25
Red Star News Network (Reporter but Tang Wen) reported on June 24th that the sparkling and flying birds flying on the shore of the sparkling and water birds welcomed two "petals" bloom. On June 24th, Chengdu Unicorn Island Park, which was built by Chengdu Tiantou Group Investment and China Construction Science and Technology Group Co., Ltd. 37 days in advance.
Unicorn Island, as the world's first industrial carrier that is mainly incubated and cultivated by unicorn companies, is known as "lotus ponds in a lotus pond". Each "petals" build in each other. The meaning of gathering. Enterprises "grow organic land" on the island, which means the original intention of unicorn island aggregation talents and enterprises.
China Construction Science and Technology Chengdu Unicorn Island Park three batches of one -section project cover an area of 25,100 square meters, with a total construction area of 77,400 square meters, including a basement, two main buildings (N4, N5). The concrete frame shear structure is divided into two structural units with shock -proof joints, and seismic anti -defense intensity is 7 degrees. As of June 2022, the main building of the N4 and N5 main buildings has been capped in the main structure of the steel concrete.
Next, the project will enter the construction curtain wall, mechanical and electrical engineering, outdoor pipe network and landscape construction. Among them, the building curtain wall has been involved in advance ahead of time, and the physical proof has been initially completed, and it is about to gradually wear a beautiful coat for the entire building.
In the future, it will be used as a leader, a place of cultivation, a gathering place for elements, and an ecological innovation zone, which will attract unicorn companies from all over the world. The park city demonstration area that implements the new development concept contributes more new economic power.
- END -
The new rules are here!From next month, do this to bear legal responsibility!
Friends who have electric bicycles at home Note! meaning! It's! The newly revised ...
Eshan Yi Autonomous County Meteorological Observatory lifted the rain and blue warning [Class IV/Gen
According to the latest meteorological data analysis, the Meteorological Observatory of Eshan County was lifted at 4:58 on June 9, 2022 to release the heavy rain blue warning signal released at 16:58