Qingdao Chengyang Public Security Traffic Police do a good job of flood control and disaster relief work
Author:Popular Net City Time:2022.06.24
Popular Network · Poster reporter Zhang Qian Correspondent Wang Dong Hu Yongxu Qingdao reported
On June 23, the heavy rainfall of Chengyang District. In order to do a good job of flood control and disaster relief work, the Qingdao Chengyang Public Security Traffic Police Brigade quickly launched a plan for the emergency management plan of severe weather traffic. The roads under the jurisdiction are safe and smooth.
As the rainfall increases, water has been affected by many roads affecting the city. The severe stagnant section includes: the intersection of Jingcheng Road, Zhengyang Road, the Lubang Fengfeng Street section of Zhengyang Road, the intersection of Xiucheng Road, Wenyang Road, Great Wall Road and Yang Road intersection, Huancheng North Road Industrial Park, Tieqi Mountain Road Chengping Intersection of the road, the intersection of Great Wall Road, the intersection of Guocheng Road, Mingyang Road, Mingyang Road Road intersection, Chongyang Road Tianqiao, Zhengyang Road Xiucheng Road intersection, Chunyang Road Huacheng Road intersection, G204 National Highway Bridge Cave Power.
In response to the current flood conditions, the Chengyang Public Security Traffic Police Brigade strengthened the investigation of hidden dangers and reserved rescue materials. Organize a large number of police forces to work on the roads in the jurisdiction and diligence. Strengthen the patrol control of National Highway, Provincial Highway, and the key roads in the jurisdiction, and remind passenger vehicle drivers to slow down and slow down. At the same time, through mobile phone SMS, LED display, etc., timely publish road conditions to the masses, enhance the masses' awareness of flood prevention and reduce disaster accidents.
At 11 o'clock on June 23, the traffic police found on Chengyang Jinyuan Road that as the rainfall gradually weakened, due to the heavy rainfall, some iron lamers in this section were blocked by debris and could not drain normally. The rainwater was touched. By opening a series of emergency measures such as the rainwater dumplings and artificially feding up the stasis, the water problem of the above sections was solved in a timely and effectively.
During the same time, Chengyang traffic police received a call from the masses for help. A small car suddenly stopped at the mouth of the lower bridge of Chengyang Zhengyang Middle Road in Chengyang, and the vehicle could not hit the fire. Faced with the driver who couldn't drive, the traffic police helped the driver to push the car to the roadside. The traffic police turned on the engine cover and found that the circuit of the vehicle was poorly exposed, and then maintained it.
At 13:40 on the same day, when the Xiazhuang Squadron police car patrolled to Chengkang Road, Chengyang District, it was found that an electric tricycle was anchoring in the middle of the road because of the stagnant water. Essence
Traffic police reminds: Please slow down and drive slowly and driving with cautious driving on rainy days. Get off after the wading section to observe to ensure that passing safety. The vehicle is involved in the wading of the vehicle, please notify the traffic police nearby or call the "122" call to help to avoid road congestion and vehicle loss.
- END -
Beijing's investigation of the Paradise Supermarket Bar investigation
The reporter learned from Beijing on the 14th that, given that the heaven supermar...
Two cases of new local infections in Haidian in Beijing, all related to the risk points of the exter
According to Beijing Daily, on June 10, at the 361st press conference at the pre...