Latest news | Chengdu self -built houses will carry out these investigations and rectifications
Author:Chengdu Daily Jinguan Time:2022.06.24
Today, the official website of the Chengdu Municipal Government issued the "Special Inspection and Remediation Work Plan for the Safety Risk of Houses in Chengdu", which is clearly clarified in the scope and content of the rectification, and pointed out that it is necessary to focus on the planning, land use, design, construction, management, etc. In key links, block management vulnerabilities, eliminate the blind zone of supervision, establish and improve the long -term supervision and long -term mechanism, resolutely curb the occurrence of a major accidental accidents in house construction, and effectively protect the safety of the people's lives and property. This special investigation and rectification work from May 2022 to December 2023 is divided into three stages.
1. Check the scope of rectification
(1) All self -built houses in urban and rural areas across the city, focusing on the urban -rural combination department, urban villages, demolition and resettlement areas, as well as the operating self -built houses involving public safety from schools and hospitals.
(2) Reconstruction of self -built houses, especially changing the structure and space of the house, changing the self -built houses such as building use and use function.
(3) Self -built houses, especially schools, medical and health institutions, cultural and sports venues, commercial industries, hotels, homestays (online houses), farmhouses (resort), hotels, industrial parks, collective markets, pension and welfare benefits Institutions, religious activities, and self -built houses such as concentrated isolation sites.
2. Check the content of the rectification
(1) Fully arranged to establish a ledger. In accordance with the content of the "Special Revision Information Collection Form for Urban and Rural Construction Houses", comprehensively understand the basic situation of urban and rural self -built housing, focus on investigating the structural safety of self -built house design, construction, and use , Land, planning, construction and other legal compliance issues, comprehensively establish a self -built information account, form a list of issues of self -built entity safety and approval procedures.
(2) Classification and rectification to eliminate hidden dangers. The renovation implementation list system plus sales number system, severe discharge and disruption, the main structure of the main structure, leaning, load -bearing walls, beams and pillars, etc., affect the security cracks of the structure, the foundation of the foundation, the collapse of the ground, the sinking, cracking and other structures around the house, the cracking and other structures Safety issues; changes in housing structure, changes in building area, changes in the number of layers, and changes in underground space; after the use of house use changes, the quality and safety and fire safety of the new use function will not be met; Earthquake high -risk areas and self -built houses for geological disaster areas were carried out. Focusing on normalized operating aggregates, 10 people, or above, business self -built house -building personnel intensive places, 3 floors and above operating self -building approval procedures are classified and controlled to eliminate safety risks caused by approval procedures.
Third, time arrangement
(1) Concentrated focus on investigation. Before August 31, 2022, the organization carried out the "100 -day action" for business self -built houses to fully complete the business self -built house investigation of three floors and above, illegal reconstruction and expansion, and densely caused major safety accidents. Adhere to the reform of the house, and the self -built houses that have hidden safety hazards, and take emergency control measures for the first time to ensure that the personnel are absolutely safe.
(2) Comprehensive investigation and rectification. From September 1st to December 31st, 2022, various districts (cities) and counties must concentrate their strengths, and in -depth arranges for all operating self -built houses, reconstruction, and self -built houses, and self -built houses in densely constructed; complete 3 floors and and 3 floors and as well as The above, dense personnel, illegal reconstruction and expansion and other operating self -built housing risks are key rectification to ensure that risk hidden dangers are in place and no major safety accidents occur. Before June 30, 2023, a comprehensive rectification of all self -built houses with hidden safety hazards, resolutely eliminating hidden safety hazards.
(3) Continuous consolidation and improvement. From July 1st to December 31st, 2023, on the basis of comprehensive investigation and rectification, "look back" and track the implementation of the problem rectification. The competent departments of various districts (cities) and counties and municipalities have summarized the rectification experience and practices in a timely manner, improved institutional measures, established grass -roots management institutions, and formed a full -chain supervision mechanism for house safety.
Chengdu Daily Jinguan News reporter Yang Shengtao Editor He Qixie Editor Liu Yonghao
- END -
Can't pick watermelon, maybe the biggest regret in summer
Coordinating | Chen Chang's Finishing | Wu Lanxin Design | Hu Xin School Division ...
Beijing Fengtai Station, the largest station in Asia today, opened today
On June 20, Beijing Fengtai Station was officially opened. There were 32 stations ...