After the reconstruction of Shijiazhuang's community, many households leak rain!After the reporter intervened ...
Author:Shijiazhuang Daily client Time:2022.06.23
The renovation of the roof was originally a good thing. Unexpectedly, the family was leaked after the renovation. After the construction party was renovated, I was still leaking. I saw that I was about to enter the rainy season. Essence Recently, Mr. Yang asked the Yan Zhao Metropolitan Daily Sunshine to run the hotline. He hoped that the relevant departments would urge the construction party to take the matter seriously, find the missing point, and completely solve the problem.
Last year, Mr. Yang's home was leaking.
Reflect: The roof leakage after the transformation
Mr. Yang lives in the top 5 unit of Building 1, Building 1, Nanxin Street Railway. According to him, the construction team re -made waterproof treatment of the roof of the building last year. What he never thought of was that the roof that did not leak water was "broken" after re -watering.
Mr. Yang recalled that July 22 last year was the worst of the rain. "The water leaked, and a lot of water accumulated in the bedroom, and the beds and bedding were wet." Mr. Yang said that it was about a month after the reconstruction of the community. He found the construction party and the other party promised to repair it, but no one came to deal with it. Due to the continuous rainfall, helplessly, Mr. Yang bought the glue and repaired the roof himself.
"After I finished myself, the leak was not serious." Mr. Yang said that the construction party did not send someone to repair until two months later. Under the coordination of the neighborhood committee, the construction party promised to give him a loss of 480 yuan in compensation for his losses to 480 yuan compensation. Essence
I thought that things could be solved successfully, and Mr. Yang did not expect that not only did he get compensation in the past year, but he started to leak water at home. "It rained a few days ago, and the balcony at home began to leak again. I could only spray glue again. I couldn't solve the problem fundamentally by myself. I was about to enter the rainy season. The bigger comes. "Mr. Yang said helplessly. He hopes that the relevant departments can urge the construction party to take the matter carefully, find the missing points, and completely solve the problem.
Survey: Many reflection of water leakage problems
After the transformation, there is more than just Mr. Yang. Mr. Yang said that he saw in the owner's group that there were about four or five households that reflected the problem of the top layer of water leakage.
"The walls of the bedroom have been moist and moldy for a long time. Last summer, a moldy smell in the room. I looked at the moldy place and pumped some putty again." Mr. Li in Unit 4, Building 1, said Although he had dealt with the wall, the wall still has obvious peeling phenomenon. Mr. Li was worried that the leakage point would not be repaired, and he caught up with heavy rainy days. His family had to leak rain. He hoped that the relevant departments could repair the house as soon as possible to solve the problem of house leakage.
Ms. Su in Unit 2, Building 1 has also been troubled by leakage. "When the rain is heavy or the rain will leak after a long time, the water is ticking down. After a long time, there will be accumulated water on the ground, and it will be pierced once every other time, which is particularly troublesome!" The location is in the corner of the balcony, there is her kitchen, because the space is limited, she can only pick up a lunch box, and when she is full of water, she will flow to the ground. She can only clean it with a broom and pier.
Every time she encounters a rainy day, Ms. Su will be anxious, worried that she will be soaked in the rain. "It's going to the rainy season again. If you don't solve it, you still have to miss it at home. Now I will be bold about the rain. It is too noisy."
Response: Supervise the construction unit to repair as soon as possible
On June 14, in response to the issues reported by the owners, the reporter contacted Shi Yongyong, the head of the Nanchang Street Office of Qiaoxi District. Shi Yongyong said that the improvement of the renovation project of the Nanxin Street railway dormitory is not the transformation project of the old community, but the "three supply and one industry" led by the property right unit is separated and transferred to the transformation, and the transformation project has not passed the street, and the streets have not participated in the streets. Acceptance of the reconstruction project. "They went directly to the bidding, and the units after winning the bid were directly stationed to residents. They did not do it with us." Shi Yongyong said that the management functions of the community have been transferred to the country to control the property.
Shi Yongyong said that they would contact the National Control Property to urge the property with the construction unit to repair it as soon as possible, and at the same time, they will actively follow up the matter.
In addition, Shi Yongyong said to how to compensate the loss of rainfall residents due to construction reasons.
Subsequently, the reporter called Guan Liqiang, the property manager of the National Control Property responsible for the Nanxin Street railway dormitory. Guan Liqiang said that the property has not been completely settled at present, and there may be some difficulties in communication. If the residents leak at home, they can report the situation to the neighborhood committee, and they will organize the construction party to repair it. In addition, Guan Liqiang added that "the warranty period of maintenance and renovation project is 5 years, and the project has not yet fully accepted. The problem of water leakage and compensation should be borne by the construction party."
On the same day, Shi Yongyong contacted reporters again that he had carried out a docking with the National Control Property and the Construction Party, and agreed to go to the scene to investigate at 10 am on the 15th. "At present, Lou Director has checked the situation of 5 households in the house. At night, let Lou Chang check it in the owner's group to see if there are still other residents who have leaks."
Progress: The construction unit has been repaired and paid for compensation
On June 15, Shi Yongyong said that the neighborhood committee and construction party had organized the survey on the spot, and the 6 residents had a leakage of 6 residents' homes. In the afternoon of the same day, the construction party organized workers to repair the omissions, and reached a consensus with the owner Mr. Yang on the issue of compensation. At the same time, Shi Yongyong said that if the residents encounter the problem of leakage, they can be reflected with the neighborhood committee and the street, and they will actively deal with it.
On June 16, the owner Mr. Yang replied that the construction party sent him 200 yuan in compensation that day."They said it was more difficult, so they would compensate 200 yuan, but that's it! Just have a psychological comfort." Mr. Yang said.Source: Yanzhao Metropolis Daily
- END -
High temperature continues to dominate the screen at the highest temperature 40 ℃+!
High -temperature liveThe highest temperature today is 41.0 ℃Appears in the Ejin ...
Husband should be eager for the chest -Mi Shiqiang, deputy chairman of the Sichuan Charity Association
2021 National Charity Association Charity Work Tour · Charity CharacterHusband sh...