Notice!From the 28th, some sections of the electric carbon road and chemical road are closed, how to bypass here →
Author:Harbin Daily Time:2022.06.23
The reporter learned from the Harbin Traffic Police Department that in order to cooperate with the construction of the East Third Ring Road Expressway of the East Third Ring Road and ensure the safety and smoothness of road traffic during construction, in accordance with the relevant provisions of the "Road Traffic Safety Law of the People's Republic of China" Some sections of chemical roads.
The relevant matters will be announced as follows:
1. From June 28th to October 30th, 2022, a two -way transportation section of the section of the electric carbon road (640 meters north of the Binsui Railway Line) was temporarily closed. During the closure of the road, the vehicles can be detour from Xiangming Street, Xiangfu Road, and Gongbin Road.
2. From June 28th to October 30th, 2022, two -way transportation of temporary closed chemical roads (special railway lines for petrochemical groups). During the closure of the road, the vehicle can be detoured from Pioneer Road, Longfeng Road, Dong Chemical Road, or from Pioneer Road, Dao Dao Road Street, Nanzhi Road, and Hadong Road.
3. The road space of closed construction area is limited. Please plan the travel route in advance. If you have entered the road of construction area, please pass strictly in accordance with the road signs, marking lines and police forces instructions to ensure driving safety.
4. For those who violate the above -mentioned traffic management measures, the public security traffic management department will be punished Essence
Source: Bingcheng+Client
Reporter Sun Ying
- END -
After the women's rhinoplasty surgery, the right ear deforms?
Ms. Zhang, a citizen of Yancheng, Jiangsu: This is our normal ears. You see the au...
deal!Xi'an completed this work before June 30 →
Since the beginning of May, Xi'an has carried out a comprehensive investigation an...