After hearing "flood" and the flood "racing", the city of the city built the embankment protective wall
Author:Golden sheep net Time:2022.06.23
On the 22nd, the rescue personnel built a protective wall in Yingcheng District, Yingcheng District, Qingyuan City, Yangcheng Evening News, Yangcheng Evening News, all media reporters Zeng Yuwen
Yangcheng Evening News reporter directly hit the front line of Qingyuan Yingde flood prevention
Yangcheng Evening News Reporter Wang Jiejie reported: At 16:00 on June 22, the reporter came to the flood protection bank of Yingcheng District, Yingde City, Qingyuan. The rescue vehicle is standing.
The staff from the Housing and Construction Bureau of Yingde City are fighting against time to strengthen the sandbag wall. The reporter saw at the top of the dam that the Beijiang River has spread on the dam, the water depth is nearly 30 cm, and the rescue personnel use sandbags to block the flood with a sandbag of nearly 1 meter.
After a while, a new truck was transported to a car powder. The rescue personnel unloaded the stone powder and filled the sandbags, and then loaded the car and transported away. These new sandbags will be sent to a dam outside 200 meters for reinforcement protection.
Wei Wujie, chief engineer of the Yingde Housing and Construction Bureau, told reporters that from 7 pm on the 21st to the present, the Yingde Municipal Housing and Urban Construction Bureau has successively sent nearly 200 people to the front line to rescue. At present, the water level on the top of the dam has landed slightly, and there is no danger for the time being.
The bottom of the dam has a deep stagnant water, and the rescue personnel drove the excavator to transport the stone powder and stones to the leakage place. The staff of the Beijiang Protection Bureau introduced that the dams have gaps in water transparent, and the gaps at the connection between the dam and the people's bridge also have water seepage. The accumulated stacked stacked stacking can reduce the water seepage and reduce the impact of the pier on the pier.
Near three kilometers away from the people's bridge section of the flood demolition, the bottom of the Jiangwan Bridge, another team of rescue staff is fighting. The reporter saw that the water level here is more than half a meter of the sandbag wall, and the danger has been eased.
A militia of a district from the Qingyuan Army told reporters that after receiving an instructions that Yingde urgently needed to reinforce, 170 militia soldiers immediately set off at 1 am on the 22nd. After arriving at more than 3 am, the militians quickly entered the battle, raced with the rising speed of the flood, and built the first wall of guarding British with both hands.
"With the joint efforts with the local people, we increased the gap of the dam gap by about 1.2 meters with sandbags." According to the militia, more than 8 o'clock on the 22nd, the sandbag wall was nearly 1 meter, and the situation was eased. At present, the militians still stick to the front line, carry out sand -reinforcement walls, and investigate gaps.
Also fighting on the front line is the backbone of the Yingde City Government. A staff member told reporters that the government departments organized the party members' assault team to support the front line. "This embankment is related to the safety of the entire Yingde. , Government staff stick to the front line of the embankment. "
When the reporter left, the water level had fallen slowly, and it fell nearly 5 cm at its peak. The rescue staff continued to strengthen the sandbag wall to view the position of the insurance in various places.
- END -
In the era when mobile games are becoming more and more configured, you need a powerful OnePlus mobi
With the 3A -level mobile game masterpieces such as \Original God\ and \Phanto...
The 15th Party Congress of Zhejiang Province opened a report on the grand opening of Yuan Jiajun
On the morning of June 20, the 15th Congress of Zhejiang Province of the Communist...